Distributed Cooperative Mechanism and Application for Monitoring of Urban Subway Construction

被引:0
|
作者
冯建中 [1 ]
白林燕 [2 ]
胡振琪 [1 ]
机构
[1] College of Resources and Safety Engineering,China University of Mining and Technology(Beijing)
[2] Institute of Remote Sensing Applications, China Academy of Science
关键词
CSCW; workflow; cooperative work; model; CISMUSC;
D O I
10.19884/j.1672-5220.2006.06.006
中图分类号
U231.6 [];
学科分类号
082302 ;
摘要
In this paper, combining the technologies of Computer Supported Cooperative Work (CSCW), Workflow and Network, the authors aim to organize virtual distributed cooperative work environment (VDCWE) and expound the running mechanism of cooperative workflow and design its algorithm for monitoring of urban subway construction. And then a prototype system was built based on the above, capable of supporting user analyzing, dealing with and managing data of monitoring, and real-timely releasing corresponding information, providing interactive virtual and distributed coordination meet-environment, dynami-cally and transparently, in favor of clients’ interoperability and solving practicing problems, and so on.
引用
收藏
页码:25 / 28 +32
页数:5
相关论文
共 50 条
  • [11] Safety Monitoring Information System of Urban Subway
    Qiu, Dongwei
    Liang, Qinghuai
    Li, Qiuping
    Wu, Runze
    2009 WASE INTERNATIONAL CONFERENCE ON INFORMATION ENGINEERING, ICIE 2009, VOL II, 2009, : 426 - +
  • [12] Monitored deformation data during the construction of an urban subway
    Hao, Xiaotian
    Wang, Bin
    Wang, Hailong
    DATA IN BRIEF, 2020, 29
  • [13] The application of the LEED in subway station construction stage
    HaiZe, Pan
    Wei, Miao
    MengJie, Chen
    Jian, He
    Electronic Journal of Geotechnical Engineering, 2015, 20 (24): : 11945 - 11952
  • [14] Construction risk analysis of urban subway in broken rock strata
    Dai, Chun-Quan
    Zhao, Zeng-Hui
    Electronic Journal of Geotechnical Engineering, 2014, 19 Q : 4189 - 4206
  • [15] Study on the Influencing Factors of Urban Subway Engineering Construction Safety
    Duan, Shixia
    Sun, Rui
    2018 3RD INTERNATIONAL CONFERENCE ON BUILDING MATERIALS AND CONSTRUCTION (ICBMC 2018), 2018, 371
  • [16] Construction risk analysis of urban subway in broken rock strata
    1600, E-Journal of Geotechnical Engineering (19):
  • [17] Design and Application of Subway Construction Site Management System
    Zhu, Pin
    Chen, Xinyi
    Wan, Fucheng
    Gao, Tengfei
    PROCEEDINGS OF THE 2017 GLOBAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING (GCMCE 2017), 2017, 132 : 73 - 76
  • [18] Research on BIM technology application in the construction of a subway station
    Li, Yanfeng
    Wang, Huichen
    Zhao, Xuefeng
    Zhang, Jin
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3396 - +
  • [19] Research on Near Miss Monitoring System on the Subway Construction Site
    Hua Jiange
    Zhao Xianbo
    Deng Xiaopeng
    Li Qiming
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1416 - 1420
  • [20] Displacement Monitoring of Subway Tracks and Tunnels According to Adjacent Construction
    Choi, Jung-Youl
    Ahn, Dae-Hui
    APPLIED SCIENCES-BASEL, 2024, 14 (05):