Analysis Of Uncertainty Over The Factory Life Cycle

被引:0
|
作者
Hingst, Lennart [1 ]
Nyhuis, Peter [1 ]
机构
[1] Leibniz Univ Hannover, Inst Prod Syst & Logist, Univ 2, D-30823 Hannover, Germany
关键词
Factory Planning; Factory Life Cycle; Uncertainty; Change Drivers; Risks;
D O I
10.15488/13497
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The cost and performance structure of a factory is determined in factory planning and activated in the operation phase with a time delay. Even though the majority of investments result from structural planning, the first conceptual and most important step in factory planning, the majority of costs occur during factory operation, the longest phase of a factory life cycle. Life cycle-oriented factory planning seeks to anticipate operation in order to increase the performance potential and reduce total costs over the entire factory life cycle. Experience shows that this can reduce total costs by about one-third, 80% of which are unplanned operating costs. Therefore, it is imperative to be aware of possible uncertainties in the course of a factory life cycle as a factory planner. Up to now, there has been an inconsistent understanding in this regard. By definition, the emphasis has been on long-term change drivers influenced by megatrends due to the strategic orientation of factory planning. The current crisis situation illustrates the relevance of an operational view on potential short-term uncertainties. The goal of the paper is to analyze the uncertainty over the factory life cycle in its entirety and to create a common understanding for factory planning so that life cycle-oriented planning and evaluation of factories can be aligned accordingly.
引用
收藏
页码:778 / 789
页数:12
相关论文
共 50 条
  • [42] Uncertainty in Life Cycle Cost of Railway Track
    Patra, Ambika Prasad
    Soderholm, Peter
    Kumar, Uday
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2008 PROCEEDINGS, 2008, : 44 - +
  • [43] UNCERTAINTY OF THE LIFE CYCLE ASSESSMENT OF BIOGAS POWER
    Alberto Huerta-Reynoso, Enrique
    Alfredo Lopez-Aguilar, Hector
    Guadalupe Gomez-Mendez, Maria
    Alberto Gomez, Jorge
    Perez-Hernandez, Antonino
    REVISTA INTERNACIONAL DE CONTAMINACION AMBIENTAL, 2022, 38 : 271 - 287
  • [44] Bridge life cycle assessment with data uncertainty
    Zhang, Yu-Rong
    Wu, Wen-Jie
    Wang, Yuan-Feng
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2016, 21 (04): : 569 - 576
  • [45] Life Cycle Dynamics of Income Uncertainty and Consumption
    Feigenbaum, James A.
    Li, Geng
    B E JOURNAL OF MACROECONOMICS, 2012, 12 (01):
  • [46] Methods for uncertainty propagation in life cycle assessment
    Groen, E. A.
    Heijungs, R.
    Bokkers, E. A. M.
    de Boer, I. J. M.
    ENVIRONMENTAL MODELLING & SOFTWARE, 2014, 62 : 316 - 325
  • [47] Reducing epistemological uncertainty in life cycle inventory
    von Bahr, B
    Steen, B
    JOURNAL OF CLEANER PRODUCTION, 2004, 12 (04) : 369 - 388
  • [48] TREATMENT OF UNCERTAINTY IN LIFE-CYCLE COSTING
    MCNICHOLS, GR
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1979, (NSYM): : 56 - 61
  • [49] Product Life Cycle Oriented Representation of Uncertainty
    Sprenger, Andre
    Anderl, Reiner
    PRODUCT LIFECYCLE MANAGEMENT: TOWARDS KNOWLEDGE-RICH ENTERPRISES (PLM 2012), 2012, 388 : 277 - 286
  • [50] Bridge life cycle assessment with data uncertainty
    Yu-Rong Zhang
    Wen-Jie Wu
    Yuan-Feng Wang
    The International Journal of Life Cycle Assessment, 2016, 21 : 569 - 576