Analysis Of Uncertainty Over The Factory Life Cycle

被引:0
|
作者
Hingst, Lennart [1 ]
Nyhuis, Peter [1 ]
机构
[1] Leibniz Univ Hannover, Inst Prod Syst & Logist, Univ 2, D-30823 Hannover, Germany
关键词
Factory Planning; Factory Life Cycle; Uncertainty; Change Drivers; Risks;
D O I
10.15488/13497
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The cost and performance structure of a factory is determined in factory planning and activated in the operation phase with a time delay. Even though the majority of investments result from structural planning, the first conceptual and most important step in factory planning, the majority of costs occur during factory operation, the longest phase of a factory life cycle. Life cycle-oriented factory planning seeks to anticipate operation in order to increase the performance potential and reduce total costs over the entire factory life cycle. Experience shows that this can reduce total costs by about one-third, 80% of which are unplanned operating costs. Therefore, it is imperative to be aware of possible uncertainties in the course of a factory life cycle as a factory planner. Up to now, there has been an inconsistent understanding in this regard. By definition, the emphasis has been on long-term change drivers influenced by megatrends due to the strategic orientation of factory planning. The current crisis situation illustrates the relevance of an operational view on potential short-term uncertainties. The goal of the paper is to analyze the uncertainty over the factory life cycle in its entirety and to create a common understanding for factory planning so that life cycle-oriented planning and evaluation of factories can be aligned accordingly.
引用
收藏
页码:778 / 789
页数:12
相关论文
共 50 条
  • [31] Uncertainty in life cycle economical analysis of cassava-based ethanol fuel
    Leng, RB
    Dai, D
    Chen, XJ
    Wang, CT
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2005, 12 (2): : 65 - 69
  • [32] The uncertainty analysis of life cycle assessment for water and wastewater systems: Review of literature
    Sheikholeslami, Zahra
    Ehteshami, Majid
    Nazif, Sara
    Semiarian, Atiye
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 73 : 131 - 143
  • [33] Uncertainty in life cycle economical analysis of cassava-based ethanol fuel
    Ru-bo Leng
    Du Dai
    Xiao-jun Chen
    Cheng-tao Wang
    Journal of Central South University of Technology, 2005, 12 : 65 - 69
  • [34] Ignoring correlation in uncertainty and sensitivity analysis in life cycle assessment: what is the risk?
    Groen, E. A.
    Heijungs, R.
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2017, 62 : 98 - 109
  • [35] Uncertainty Analysis of Life Cycle Assessment Input Parameters on City Quarter Level
    Harter, Hannes
    Willenborg, Bruno
    Schneider-Marin, Patricia
    Banihashemi, Farzan
    Vollmer, Michael
    Kierdorf, Daniel
    Kolbe, Thomas H.
    Lang, Werner
    PROCEEDINGS OF BUILDING SIMULATION 2021: 17TH CONFERENCE OF IBPSA, 2022, 17 : 1880 - 1887
  • [36] MULTICRITERIA DECISION ANALYSIS AND LIFE CYCLE ASSESSMENT Applications Under High Uncertainty
    Rogers, K.
    Seager, T.
    Linkov, I.
    REAL-TIME AND DELIBERATIVE DECISION MAKING: APPLICATION TO EMERGING STRESSORS, 2008, : 305 - 314
  • [37] SENSITIVITY AND UNCERTAINTY ANALYSIS ON VARIABLES OF LIFE CYCLE COST FOR HOSPITAL POWER TRANSFORMER
    Bian, J. P.
    Feng, Y. J.
    Sun, X. Y.
    Yang, S.
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2016, 118 : 107 - 107
  • [38] Life cycle inventory comparison of different building insulation materials and uncertainty analysis
    Su, Xing
    Luo, Zhong
    Li, Yuhang
    Huang, Chenhao
    JOURNAL OF CLEANER PRODUCTION, 2016, 112 : 275 - 281
  • [39] Uncertainty in life cycle economical analysis of cassava-based ethanol fuel
    冷如波
    戴杜
    陈晓军
    王成焘
    Journal of Central South University, 2005, (S2) : 65 - 69
  • [40] Life Cycle Analysis for the Concept Design of a Smart Mobile Factory (SMF) for Infrastructure Construction Projects
    Dallasega, Patrick
    Kaushal, Ishaan
    Revolti, Andrea
    Miori, Nicholas
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS-PRODUCTION MANAGEMENT SYSTEMS FOR VOLATILE, UNCERTAIN, COMPLEX, AND AMBIGUOUS ENVIRONMENTS, APMS 2024, PT V, 2024, 732 : 33 - 47