Analysis Of Uncertainty Over The Factory Life Cycle

被引:0
|
作者
Hingst, Lennart [1 ]
Nyhuis, Peter [1 ]
机构
[1] Leibniz Univ Hannover, Inst Prod Syst & Logist, Univ 2, D-30823 Hannover, Germany
关键词
Factory Planning; Factory Life Cycle; Uncertainty; Change Drivers; Risks;
D O I
10.15488/13497
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The cost and performance structure of a factory is determined in factory planning and activated in the operation phase with a time delay. Even though the majority of investments result from structural planning, the first conceptual and most important step in factory planning, the majority of costs occur during factory operation, the longest phase of a factory life cycle. Life cycle-oriented factory planning seeks to anticipate operation in order to increase the performance potential and reduce total costs over the entire factory life cycle. Experience shows that this can reduce total costs by about one-third, 80% of which are unplanned operating costs. Therefore, it is imperative to be aware of possible uncertainties in the course of a factory life cycle as a factory planner. Up to now, there has been an inconsistent understanding in this regard. By definition, the emphasis has been on long-term change drivers influenced by megatrends due to the strategic orientation of factory planning. The current crisis situation illustrates the relevance of an operational view on potential short-term uncertainties. The goal of the paper is to analyze the uncertainty over the factory life cycle in its entirety and to create a common understanding for factory planning so that life cycle-oriented planning and evaluation of factories can be aligned accordingly.
引用
收藏
页码:778 / 789
页数:12
相关论文
共 50 条
  • [1] Uncertainty analysis of life cycle assessment of asphalt surfacings
    Abed, Ahmed
    Bizarro, Diana Eliza Godoi
    Neves, Luis
    Parry, Tony
    Keijzer, Elisabeth
    Lo Presti, Davide
    Kalman, Bjorn
    Carrion, Ana Jimenez Del Barco
    Mantalovas, Konstantinos
    Buttitta, Gabriella
    Airey, Gordon
    ROAD MATERIALS AND PAVEMENT DESIGN, 2024, 25 (02) : 219 - 238
  • [2] UNCERTAINTY OF LIFE CYCLE CLIMATE PERFORMANCE (LCCP) ANALYSIS
    Makhnatch, P.
    Khodabandeh, R.
    12TH IIR GUSTAV LORENTZEN NATURAL WORKING FLUIDS CONFERENCE, 2016, : 162 - 169
  • [3] UNCERTAINTY AND THE ACCUMULATION OF HUMAN-CAPITAL OVER THE LIFE-CYCLE
    WILLIAMS, JT
    JOURNAL OF BUSINESS, 1979, 52 (04): : 521 - 548
  • [4] Product Life Cycle in Digital factory
    Kurkin, Ondrej
    Januska, Martin
    KNOWLEDGE MANAGEMENT AND INNOVATION: A BUSINESS COMPETITIVE EDGE PERSPECTIVE, VOLS 1-3, 2010, : 1881 - +
  • [5] The network factory - About the life cycle synchronisation of product and factory
    Die netzwerkfabrik: Ein beitrag zur synchronisation von produkt- und fabriklebenszyklus
    Liesebach, T.J., 2012, Carl Hanser Verlag (107):
  • [6] Uncertainty, imperfect information, and expectation formation over the firm's life cycle
    Chen, Cheng
    Senga, Tatsuro
    Sun, Chang
    Zhang, Hongyong
    JOURNAL OF MONETARY ECONOMICS, 2023, 140 : 60 - 77
  • [7] On the use of possibility theory in uncertainty analysis of life cycle inventory
    Jorge C. S. André
    Daniela R. Lopes
    The International Journal of Life Cycle Assessment, 2012, 17 : 350 - 361
  • [8] Comparative Life Cycle Assessment of Photovoltaic Systems with Uncertainty Analysis
    Nordin, Atiqah Hamizah Mohd
    Sulaiman, Shahril Irwan
    Mustapa, Rijalul Fahmi
    Shahruddin, Muhammad Khairul Hazim
    SMART GRID AND RENEWABLE ENERGY SYSTEMS, ICRCE 2024, 2024, 1238 : 41 - 47
  • [9] Life Cycle Cost Analysis for Design Optimization Under Uncertainty
    Du, Li
    Wang, Zhonglai
    Huang, Hong-Zhong
    Lu, Cong
    Miao, Qiang
    PROCEEDINGS OF 2009 8TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY, VOLS I AND II: HIGHLY RELIABLE, EASY TO MAINTAIN AND READY TO SUPPORT, 2009, : 54 - 57
  • [10] On the use of possibility theory in uncertainty analysis of life cycle inventory
    Andre, Jorge C. S.
    Lopes, Daniela R.
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2012, 17 (03): : 350 - 361