Dynamic multi-period recycling collection routing with uncertain material quality

被引:0
|
作者
Cuellar-Usaquen, Daniel [1 ]
Ulmer, Marlin W. [2 ]
Antons, Oliver [3 ,4 ]
Arlinghaus, Julia C. [3 ,4 ]
机构
[1] Univ Andes, Ind Engn Dept, Cra 1 18A-12, Bogota 111711, Colombia
[2] Otto von Guericke Univ, Management Sci, Univ Pl 2, D-39106 Magdeburg, Germany
[3] Otto von Guericke Univ, Prod Syst & Automat, Univ Pl 2, D-39106 Magdeburg, Germany
[4] Fraunhofer Inst Factory Operat & Automat, Sandtorstr 22, D-39106 Magdeburg, Germany
关键词
Routing; Circular economy; Sequential decision process; Stochastic lookahead; LOOP SUPPLY CHAIN; NETWORK DESIGN; REVERSE LOGISTICS; INVENTORY; MANAGEMENT; ALGORITHM; POLICIES; DEMAND; YIELD;
D O I
10.1007/s00291-025-00808-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of collecting and processing waste material. At a production facility, a known amount of inventory is required for production (e.g., paper) for every period. Instead of new material, the facility relies on collected and processed waste material (e.g., paper waste). This material is collected from regional waste collection locations. The amount of waste material per location is uncertain, as is the quality of the collected waste, i.e., the resulting inventory when processing the material. If the inventory is insufficient at the end of a period, costly new material must be bought. Each period, decisions are made about how much waste material to collect from which location and how to route the collection vehicles accordingly. Ideally, inventory is built to hedge against quality uncertainty and to ensure efficient routing operations in future periods. We propose a stochastic lookahead method that samples a set of scenarios and solves a simplified two-stage stochastic program in every period. We show the value of our method for two case studies, one based on real-world data from Sachsen-Anhalt, Germany, and one from the literature with data from the United Kingdom. We further conduct a detailed analysis of our method and the problem characteristics. The results show that our method effectively anticipates all sources of uncertainty, reducing cost significantly compared to benchmark policies. This superior performance is due to appropriate state-dependent supplier selection that considers the percentage of material loss, available material, and routing cost for current and future periods.
引用
收藏
页数:44
相关论文
共 50 条
  • [31] Multi-period dynamic supply contracts with cancellation
    Xu, NX
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (12) : 3129 - 3142
  • [32] Robust Optimization of the Multi-Objective Multi-Period Location-Routing Problem for Epidemic Logistics System with Uncertain Demand
    Long, Shengjie
    Zhang, Dezhi
    Liang, Yijing
    Li, Shuangyan
    Chen, Wanru
    IEEE Access, 2021, 9 : 151912 - 151930
  • [33] An analytic solution for multi-period uncertain portfolio selection problem
    Li, Bo
    Sun, Yufei
    Teo, Kok Lay
    FUZZY OPTIMIZATION AND DECISION MAKING, 2022, 21 (02) : 319 - 333
  • [34] An analytic solution for multi-period uncertain portfolio selection problem
    Bo Li
    Yufei Sun
    Kok Lay Teo
    Fuzzy Optimization and Decision Making, 2022, 21 : 319 - 333
  • [35] Multi-period orienteering with uncertain adoption likelihood and waiting at customers
    Zhang, Shu
    Ohlmann, Jeffrey W.
    Thomas, Barrett W.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 282 (01) : 288 - 303
  • [36] Multi-period vehicle routing and crew scheduling with outsourcing options
    Zaepfel, Guenther
    Boegl, Michael
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (02) : 980 - 996
  • [37] A variable neighborhood search for the multi-period collection of recyclable materials
    Elbek, Maria
    Wohlk, Sanne
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (02) : 540 - 550
  • [38] An approximate dynamic programming algorithm for multi-period maritime fleet renewal problem under uncertain market
    Wang, Tingsong
    Tian, Xuecheng
    Guan, Xu
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 16 (1-2) : 96 - 119
  • [39] Multi-period location-routing-inventory problem based on collector managed inventory in scrap tires recycling systems
    Tang, Yan
    Ma, Zu-Jun
    Zhao, Juan-Juan
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (02): : 397 - 403
  • [40] Determining the optimal quantity and quality levels of used product returns for remanufacturing under multi-period and uncertain quality of returns
    Aydin, R.
    Kwong, C. K.
    Geda, M. W.
    Kremer, G. E. Okudan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 94 (9-12): : 4401 - 4414