Dynamic multi-period recycling collection routing with uncertain material quality

被引:0
|
作者
Cuellar-Usaquen, Daniel [1 ]
Ulmer, Marlin W. [2 ]
Antons, Oliver [3 ,4 ]
Arlinghaus, Julia C. [3 ,4 ]
机构
[1] Univ Andes, Ind Engn Dept, Cra 1 18A-12, Bogota 111711, Colombia
[2] Otto von Guericke Univ, Management Sci, Univ Pl 2, D-39106 Magdeburg, Germany
[3] Otto von Guericke Univ, Prod Syst & Automat, Univ Pl 2, D-39106 Magdeburg, Germany
[4] Fraunhofer Inst Factory Operat & Automat, Sandtorstr 22, D-39106 Magdeburg, Germany
关键词
Routing; Circular economy; Sequential decision process; Stochastic lookahead; LOOP SUPPLY CHAIN; NETWORK DESIGN; REVERSE LOGISTICS; INVENTORY; MANAGEMENT; ALGORITHM; POLICIES; DEMAND; YIELD;
D O I
10.1007/s00291-025-00808-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of collecting and processing waste material. At a production facility, a known amount of inventory is required for production (e.g., paper) for every period. Instead of new material, the facility relies on collected and processed waste material (e.g., paper waste). This material is collected from regional waste collection locations. The amount of waste material per location is uncertain, as is the quality of the collected waste, i.e., the resulting inventory when processing the material. If the inventory is insufficient at the end of a period, costly new material must be bought. Each period, decisions are made about how much waste material to collect from which location and how to route the collection vehicles accordingly. Ideally, inventory is built to hedge against quality uncertainty and to ensure efficient routing operations in future periods. We propose a stochastic lookahead method that samples a set of scenarios and solves a simplified two-stage stochastic program in every period. We show the value of our method for two case studies, one based on real-world data from Sachsen-Anhalt, Germany, and one from the literature with data from the United Kingdom. We further conduct a detailed analysis of our method and the problem characteristics. The results show that our method effectively anticipates all sources of uncertainty, reducing cost significantly compared to benchmark policies. This superior performance is due to appropriate state-dependent supplier selection that considers the percentage of material loss, available material, and routing cost for current and future periods.
引用
收藏
页数:44
相关论文
共 50 条
  • [21] On the multi-period combined maintenance and routing optimisation problem
    Lopez-Santana, Eduyn
    Mendez, German
    Franco, Carlos
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (23) : 8265 - 8290
  • [22] MULTI-PERIOD INVENTORY VEHICLE ROUTING PROBLEM.
    Kubo, Mikio
    Kasugai, Hiroshi
    Waseda Daigaku Rikogaku Kenkyusho Hokoku/Bulletin of Science and Engineering Research Laboratory,, 1987, (118): : 19 - 26
  • [23] Multi-item, multi-period production planning with uncertain demand
    Sox, CR
    Muckstadt, JA
    IIE TRANSACTIONS, 1996, 28 (11) : 891 - 900
  • [24] Multi-period uncertain portfolio optimization model with minimum transaction lots and dynamic risk preference
    Dai, Yuanzhen
    Qin, Zhongfeng
    APPLIED SOFT COMPUTING, 2021, 109 (109)
  • [25] A dynamic multi-period general routing problem arising in postal service and parcel delivery systems
    Lagana, Demetrio
    Laporte, Gilbert
    Vocaturo, Francesca
    COMPUTERS & OPERATIONS RESEARCH, 2021, 129
  • [26] Robust Optimization of the Multi-Objective Multi-Period Location-Routing Problem for Epidemic Logistics System With Uncertain Demand
    Long, Shengjie
    Zhang, Dezhi
    Liang, Yijing
    Li, Shuangyan
    Chen, Wanru
    IEEE ACCESS, 2021, 9 : 151912 - 151930
  • [27] A MULTI-PERIOD INVENTORY MODEL FOR DETERIORATING ITEMS IN UNCERTAIN ENVIRONMENT
    Ning, Yufu
    Yan, Limei
    Sha, Huanbin
    INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2013, 21 : 113 - 125
  • [28] A risk index model for multi-period uncertain portfolio selection
    Huang, Xiaoxia
    Qiao, Lei
    INFORMATION SCIENCES, 2012, 217 : 108 - 116
  • [29] Dynamic CVaR with multi-period risk problems
    Meng, Zhiqing
    Jiang, Min
    Hu, Qiying
    JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2011, 24 (05) : 907 - 918
  • [30] Dynamic CVaR with multi-period risk problems
    Zhiqing Meng
    Min Jiang
    Qiying Hu
    Journal of Systems Science and Complexity, 2011, 24 : 907 - 918