Timing of Preventive Highway Maintenance: A Study from the Whole Life Cycle Perspective

被引:0
|
作者
Wubuli, Abulimiti [1 ]
Li, Fangfang [2 ]
Cao, Shanwei [1 ]
Zhang, Lingling [1 ,3 ,4 ]
机构
[1] Univ Chinese Acad Sci, Sch Econ & Management, Beijing 100190, Peoples R China
[2] Changchun Humanities & Sci Coll, Sch Sci & Technol, Changchun 130117, Peoples R China
[3] Univ Chinese Acad Sci, Philosophy & Social Sci Lab, Digital Econ Monitoring Forecast Early Warning & P, Minist Educ, Beijing 100190, Peoples R China
[4] Chinese Acad Sci, Key Lab Big Data Min & Knowledge Management, Beijing 100190, Peoples R China
基金
中国国家自然科学基金;
关键词
whole life cycle; preventive highway maintenance; benefits and costs ratio;
D O I
10.3390/su17031009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As the mileage of China's highways increases, the focus of highway development has shifted from construction to maintenance and management. With the rapid increase in highway traffic, the overuse of highways, combined with the effects of climate change, has accelerated the occurrence of highway problems and poses new challenges to maintenance strategies. From a system optimization perspective, this paper examines the problem of determining the optimal timing of preventive maintenance on highways. To overcome the shortcomings of this method, which cannot reflect the economic benefits and costs, the total benefits and costs were calculated for different pavement ages within a given analysis period, based on the framework of life cycle analysis. The maintenance timing program with the highest cost-benefit ratio was taken as the optimum maintenance timing program and an example analysis was adopted to validate the feasibility of this method. When the timing of preventive maintenance is later in a pavement's life cycle, the total life cycle benefit decreases while the total life cycle cost increases. Compared to previous studies, this paper considers both direct and indirect influences simultaneously, showing that indirect influence contributes to shortening the timing of pavement preventive maintenance.
引用
收藏
页数:21
相关论文
共 50 条
  • [41] A Markovian approach for optimizing highway life-cycle with genetic algorithms by considering maintenance of roadside appurtenances
    Jha, Manoj K.
    Abdullah, Jawad
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2006, 343 (4-5): : 404 - 419
  • [42] Study on the Data Management of Citizen Science: From the Data Life Cycle Perspective
    Shwe K.M.
    Shwe, Khin Mar (khinmarshwe@163.com), 1600, Elsevier Ltd (04): : 279 - 296
  • [43] A Markovian approach for optimizing highway life-cycle with genetic algorithms by considering maintenance of roadside appurtenances
    Department of Civil Engineering, Morgan State University, Baltimore, MD 21251, United States
    J Franklin Inst, 2006, 4-5 (404-419):
  • [44] Regression Models of Road User Cost Prediction for Highway Maintenance and Rehabilitation for Life Cycle Planning in California
    Kedarisetty, Sampat
    Kim, Changmo
    Harvey, John T.
    TRANSPORTATION RESEARCH RECORD, 2022, 2676 (01) : 18 - 29
  • [45] A survey of topic models: From a whole-cycle perspective
    Cheng, Gang
    You, Qinliang
    Shi, Lei
    Wang, Zhenxue
    Luo, Jia
    Li, Tianbin
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (06) : 9929 - 9953
  • [46] ON THE EXPECTED NUMBER OF FAILURES AND MAINTENANCE COST PREDICTION OF REPAIRABLE SYSTEMS FROM LIFE CYCLE COST MODELING PERSPECTIVE
    Waghmode, Laxman Yadu
    Sahasrabudhe, Anil Dattatraya
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 5, 2010, : 553 - +
  • [47] Assessing the Energetic and Environmental Impacts of the Operation and Maintenance of Spanish Sewer Networks from a Life-Cycle Perspective
    Petit-Boix, Anna
    Sanjuan-Delmas, David
    Chenel, Sergio
    Marin, Desiree
    Gasol, Carles M.
    Farreny, Ramon
    Villalba, Gara
    Suarez-Ojeda, Maria Eugenia
    Gabarrell, Xavier
    Josa, Alejandro
    Rieradevall, Joan
    WATER RESOURCES MANAGEMENT, 2015, 29 (08) : 2581 - 2597
  • [48] Assessing the Energetic and Environmental Impacts of the Operation and Maintenance of Spanish Sewer Networks from a Life-Cycle Perspective
    Anna Petit-Boix
    David Sanjuan-Delmás
    Sergio Chenel
    Desirée Marín
    Carles M. Gasol
    Ramon Farreny
    Gara Villalba
    María Eugenia Suárez-Ojeda
    Xavier Gabarrell
    Alejandro Josa
    Joan Rieradevall
    Water Resources Management, 2015, 29 : 2581 - 2597
  • [49] Characterization and evaluation of brittleness of deep bedded sandstone from the perspective of the whole life-cycle evolution process
    Zhixiang Song
    Junwen Zhang
    Yang Zhang
    Xukai Dong
    Shanyong Wang
    InternationalJournalofMiningScienceandTechnology, 2023, 33 (04) : 481 - 502
  • [50] Characterization and evaluation of brittleness of deep bedded sandstone from the perspective of the whole life-cycle evolution process
    Song, Zhixiang
    Zhang, Junwen
    Zhang, Yang
    Dong, Xukai
    Wang, Shanyong
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2023, 33 (04) : 481 - 502