Timing of Preventive Highway Maintenance: A Study from the Whole Life Cycle Perspective

被引:0
|
作者
Wubuli, Abulimiti [1 ]
Li, Fangfang [2 ]
Cao, Shanwei [1 ]
Zhang, Lingling [1 ,3 ,4 ]
机构
[1] Univ Chinese Acad Sci, Sch Econ & Management, Beijing 100190, Peoples R China
[2] Changchun Humanities & Sci Coll, Sch Sci & Technol, Changchun 130117, Peoples R China
[3] Univ Chinese Acad Sci, Philosophy & Social Sci Lab, Digital Econ Monitoring Forecast Early Warning & P, Minist Educ, Beijing 100190, Peoples R China
[4] Chinese Acad Sci, Key Lab Big Data Min & Knowledge Management, Beijing 100190, Peoples R China
基金
中国国家自然科学基金;
关键词
whole life cycle; preventive highway maintenance; benefits and costs ratio;
D O I
10.3390/su17031009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As the mileage of China's highways increases, the focus of highway development has shifted from construction to maintenance and management. With the rapid increase in highway traffic, the overuse of highways, combined with the effects of climate change, has accelerated the occurrence of highway problems and poses new challenges to maintenance strategies. From a system optimization perspective, this paper examines the problem of determining the optimal timing of preventive maintenance on highways. To overcome the shortcomings of this method, which cannot reflect the economic benefits and costs, the total benefits and costs were calculated for different pavement ages within a given analysis period, based on the framework of life cycle analysis. The maintenance timing program with the highest cost-benefit ratio was taken as the optimum maintenance timing program and an example analysis was adopted to validate the feasibility of this method. When the timing of preventive maintenance is later in a pavement's life cycle, the total life cycle benefit decreases while the total life cycle cost increases. Compared to previous studies, this paper considers both direct and indirect influences simultaneously, showing that indirect influence contributes to shortening the timing of pavement preventive maintenance.
引用
收藏
页数:21
相关论文
共 50 条
  • [31] A multi-objective optimization strategy for building carbon emission from the whole life cycle perspective
    Chen, Ruijun
    Tsay, Yaw-Shyan
    Zhang, Ting
    ENERGY, 2023, 262
  • [32] Identification of the potential for carbon dioxide emissions reduction from highway maintenance projects using life cycle assessment: A case in China
    Liu, Yuanyuan
    Wang, Yuanqing
    Li, Di
    Feng, Fan
    Yu, Qian
    Xue, Shuqi
    JOURNAL OF CLEANER PRODUCTION, 2019, 219 : 743 - 752
  • [33] Probabilistic Approach to Life-Cycle Cost Analysis of Preventive Maintenance Strategies on Flexible Pavements
    Harvey, John T.
    Rezaei, Arash
    Lee, Charles
    TRANSPORTATION RESEARCH RECORD, 2012, (2292) : 61 - 72
  • [34] Safe Nanotextiles from a Life Cycle Perspective
    Som, C.
    Halbeisen, M.
    Heuberger, M.
    Koehler, A.
    NANOTECH CONFERENCE & EXPO 2009, VOL 1, TECHNICAL PROCEEDINGS: NANOTECHNOLOGY 2009: FABRICATION, PARTICLES, CHARACTERIZATION, MEMS, ELECTRONICS AND PHOTONICS, 2009, : 86 - +
  • [35] The life cycle of the alphaviruses: From an antiviral perspective
    Skidmore, Andrew M.
    Bradfute, Steven B.
    ANTIVIRAL RESEARCH, 2023, 209
  • [36] Novel Approach for Multicriteria Optimization of Life-Cycle Preventive and Essential Maintenance of Deteriorating Structures
    Okasha, Nader M.
    Frangopol, Dan M.
    JOURNAL OF STRUCTURAL ENGINEERING, 2010, 136 (08) : 1009 - 1022
  • [37] Development of a productive service module based on a life cycle perspective of maintenance issues
    Cunha, PF
    Duarte, JAC
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2004, 53 (01) : 13 - 16
  • [38] Life Cycle Assessment of Highway Construction Projects in India-A Case Study of National Highway 66
    Samad, Shereena
    Ittyeipe, Alan Verghese
    Ramaswamy, K. P.
    PROCEEDINGS OF SECON 2024, 2024, 607 : 753 - 761
  • [39] A Markovian approach for optimizing highway life-cycle with genetic algorithms by considering maintenance of roadside appurtenances
    Jha, Manoj K.
    Abdullah, Jawad
    Metal Finishing, 2006, 104 (06) : 404 - 419
  • [40] A life-cycle optimization model using semi-markov process for highway bridge maintenance
    Wu, Dayong
    Yuan, Changwei
    Kumfer, Wesley
    Liu, Hongchao
    APPLIED MATHEMATICAL MODELLING, 2017, 43 : 45 - 60