A multi-objective fuzzy programming model for port tugboat scheduling based on the Stackelberg game

被引:3
|
作者
Ren, Yangjun [1 ]
Chen, Qiong [2 ]
Lau, Yui-yip [3 ]
Dulebenets, Maxim A. [4 ]
Li, Botang [5 ]
Li, Mengchi [6 ]
机构
[1] Changzhou Vocat Inst Text & Garment, Sch Econ & Trade, Changzhou 213164, Peoples R China
[2] Jimei Univ, Nav Coll, Xiamen 361021, Peoples R China
[3] Hong Kong Polytech Univ, Coll Profess & Continuing Educ, Div Business & Hospitality Management, Hong Kong, Peoples R China
[4] Florida State Univ, Florida A&M Univ, Dept Civil & Environm Engn, Tallahassee, FL 32310 USA
[5] Guangzhou Maritime Univ, Dept Port & Shipping Management, Guangzhou 510725, Peoples R China
[6] Guangzhou Maritime Univ, Sch Shipping Econ & Trade, Guangzhou 510725, Peoples R China
来源
SCIENTIFIC REPORTS | 2024年 / 14卷 / 01期
关键词
Tugboat scheduling; Stackelberg game; Fairness principle; Task random arrival; Fuzzy programming; GULL OPTIMIZATION ALGORITHM; ASSIGNMENT PROBLEM; ALLOCATION;
D O I
10.1038/s41598-024-76898-6
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
To solve the optimization problem of tugboat scheduling for assisting ships in entering and exiting ports in uncertain environments, this study investigates the impact of the decisions of tugboat operators and port dispatchers on tugboat scheduling under the scenario of dynamic task arrival and fuzzy tugboat operation time. Considering the features of the shortest distance tugboat principle, the first available tugboat principle, and the principle of fairness in the task volume of each tugboat, the tugboat company aims to minimize the total daily fuel consumption of tugboat operations, maximize the total buffer time of dynamic tasks, and minimize the total completion time as the objective functions. Due to the limitations of port vessel berthing and departure, as well as the allocation standards for piloting or relocating tugboats, the present study proposes a Stackelberg game-based fuzzy model for port tugboat scheduling with the tugboat operator and port dispatcher acting as decision makers at the upper and lower levels, respectively. A seagull optimization algorithm based on priority encoding and genetic operators is designed as a solution approach. CPLEX, genetic algorithm, standard seagull optimization algorithm, and simulated annealing algorithm are used to compare and analyze the solution results for the 45 problem cases generated from the actual data obtained from the Guangzhou Port. The results verify the efficiency of the proposed seagull optimization algorithm based on priority encoding and genetic operators. Furthermore, additional experiments are conducted to evaluate the changes in fairness coefficient, uncertain parameter correlation coefficients, and objective function correlation coefficients to demonstrate the practicality of the fuzzy programming model. This analysis involves adjusting the confidence level incrementally from 0 to 100% with respect to the model's uncertain parameters.
引用
收藏
页数:39
相关论文
共 50 条
  • [41] WTA for air and missile defense based on fuzzy multi-objective programming
    Xu H.
    Xing Q.
    Wang W.
    2018, Chinese Institute of Electronics (40): : 563 - 570
  • [42] Fuzzy Multi-Objective Linear Programming Based on Compromise VIKOR Method
    Hajiagha, Seyed Hossein Razavi
    Mahdiraji, Hannan Amoozad
    Zavadskas, Edmundas Kazimieras
    Hashemi, Shide Sadat
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2014, 13 (04) : 679 - 698
  • [43] A new fuzzy clustering algorithm based on multi-objective mathematical programming
    Soheil Sadi-Nezhad
    Kaveh Khalili-Damghani
    Ameneh Norouzi
    TOP, 2015, 23 : 168 - 197
  • [44] Multi-objective Constraint programming for Scheduling Operating Theatres
    Meskens, Nadine
    Duvivier, David
    Hanset, Arnauld
    Gossart, Daisy
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 1486 - 1495
  • [45] A new fuzzy clustering algorithm based on multi-objective mathematical programming
    Sadi-Nezhad, Soheil
    Khalili-Damghani, Kaveh
    Norouzi, Ameneh
    TOP, 2015, 23 (01) : 168 - 197
  • [46] Approaches based on fuzzy genetic algorithm for multi-objective programming problems
    Hou, JR
    Huang, PQ
    Zhao, XF
    PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 633 - 637
  • [47] A Multi-objective Method for Solving Fuzzy Linear Programming Based on Semi-infinite Model
    Nasseri, S. H.
    Zavieh, H.
    FUZZY INFORMATION AND ENGINEERING, 2018, 10 (01) : 91 - 98
  • [48] A multi-objective mixed integer linear programming model for thesis defence scheduling
    Almeida, Joao
    Santos, Daniel
    Figueira, Jose Rui
    Francisco, Alexandre P.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 312 (01) : 92 - 116
  • [49] Scheduling the flying squad nurses of a hospital using a multi-objective programming model
    Viviane Gascon
    Sophie Villeneuve
    Philippe Michelon
    Jacques A. Ferland
    Annals of Operations Research, 2000, 96 : 149 - 166
  • [50] Scheduling the flying squad nurses of a hospital using a multi-objective programming model
    Gascon, V
    Villeneuve, S
    Michelon, P
    Ferland, JA
    ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) : 149 - 166