A multi-objective fuzzy programming model for port tugboat scheduling based on the Stackelberg game

被引:3
|
作者
Ren, Yangjun [1 ]
Chen, Qiong [2 ]
Lau, Yui-yip [3 ]
Dulebenets, Maxim A. [4 ]
Li, Botang [5 ]
Li, Mengchi [6 ]
机构
[1] Changzhou Vocat Inst Text & Garment, Sch Econ & Trade, Changzhou 213164, Peoples R China
[2] Jimei Univ, Nav Coll, Xiamen 361021, Peoples R China
[3] Hong Kong Polytech Univ, Coll Profess & Continuing Educ, Div Business & Hospitality Management, Hong Kong, Peoples R China
[4] Florida State Univ, Florida A&M Univ, Dept Civil & Environm Engn, Tallahassee, FL 32310 USA
[5] Guangzhou Maritime Univ, Dept Port & Shipping Management, Guangzhou 510725, Peoples R China
[6] Guangzhou Maritime Univ, Sch Shipping Econ & Trade, Guangzhou 510725, Peoples R China
来源
SCIENTIFIC REPORTS | 2024年 / 14卷 / 01期
关键词
Tugboat scheduling; Stackelberg game; Fairness principle; Task random arrival; Fuzzy programming; GULL OPTIMIZATION ALGORITHM; ASSIGNMENT PROBLEM; ALLOCATION;
D O I
10.1038/s41598-024-76898-6
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
To solve the optimization problem of tugboat scheduling for assisting ships in entering and exiting ports in uncertain environments, this study investigates the impact of the decisions of tugboat operators and port dispatchers on tugboat scheduling under the scenario of dynamic task arrival and fuzzy tugboat operation time. Considering the features of the shortest distance tugboat principle, the first available tugboat principle, and the principle of fairness in the task volume of each tugboat, the tugboat company aims to minimize the total daily fuel consumption of tugboat operations, maximize the total buffer time of dynamic tasks, and minimize the total completion time as the objective functions. Due to the limitations of port vessel berthing and departure, as well as the allocation standards for piloting or relocating tugboats, the present study proposes a Stackelberg game-based fuzzy model for port tugboat scheduling with the tugboat operator and port dispatcher acting as decision makers at the upper and lower levels, respectively. A seagull optimization algorithm based on priority encoding and genetic operators is designed as a solution approach. CPLEX, genetic algorithm, standard seagull optimization algorithm, and simulated annealing algorithm are used to compare and analyze the solution results for the 45 problem cases generated from the actual data obtained from the Guangzhou Port. The results verify the efficiency of the proposed seagull optimization algorithm based on priority encoding and genetic operators. Furthermore, additional experiments are conducted to evaluate the changes in fairness coefficient, uncertain parameter correlation coefficients, and objective function correlation coefficients to demonstrate the practicality of the fuzzy programming model. This analysis involves adjusting the confidence level incrementally from 0 to 100% with respect to the model's uncertain parameters.
引用
收藏
页数:39
相关论文
共 50 条
  • [31] Multi-objective linear programming model with T-fuzzy variables
    Cao, BY
    6TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL VIII, PROCEEDINGS: CONCEPTS AND APPLICATIONS OF SYSTEMICS, CYBERNETICS AND INFORMATICS II, 2002, : 7 - 10
  • [32] Multi-objective programming consensus model based on evolutionary game analysis in group decision making
    You, Xinli
    Hou, Fujun
    INFORMATION FUSION, 2023, 93 : 132 - 149
  • [33] No-wait flow shop scheduling using fuzzy multi-objective linear programming
    Javadi, Babak
    Saidi-Mehrabad, M.
    Haji, Alireza
    Mahdavi, Iraj
    Jolai, F.
    Mahdavi-Amiri, N.
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2008, 345 (05): : 452 - 467
  • [34] A fuzzy robust stochastic mathematical programming approach for multi-objective scheduling of the surgical cases
    Mohammad Mahdi Nasiri
    Farzaneh Shakouhi
    Fariborz Jolai
    OPSEARCH, 2019, 56 : 890 - 910
  • [35] Application of fuzzy multi-objective linear programming to no-wait flow shop scheduling
    Haji, Alireza
    Javadi, Babak
    Alipour, Kaveh Fallah
    RECENT PROGRESS IN COMPUTATIONAL SCIENCES AND ENGINEERING, VOLS 7A AND 7B, 2006, 7A-B : 192 - 194
  • [36] A fuzzy robust stochastic mathematical programming approach for multi-objective scheduling of the surgical cases
    Nasiri, Mohammad Mahdi
    Shakouhi, Farzaneh
    Jolai, Fariborz
    OPSEARCH, 2019, 56 (03) : 890 - 910
  • [37] Multi-objective Fuzzy Bi-matrix Game Model: A Multicriteria Non-Linear Programming Approach
    Zhang, Wei
    Xing, Yumei
    Qiu, Dong
    SYMMETRY-BASEL, 2017, 9 (08):
  • [38] Multi-Objective Genetic Programming based on Decomposition on Evolving Scheduling Heuristics for Dynamic Scheduling
    Xu, Meng
    Mei, Yi
    Zhang, Fangfang
    Zhang, Mengjie
    PROCEEDINGS OF THE 2023 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION, GECCO 2023 COMPANION, 2023, : 427 - 430
  • [39] Multi-objective Stackelberg game model for water supply networks against interdictions with incomplete information
    Jiang, J.
    Liu, X.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (03) : 920 - 933
  • [40] A fuzzy mathematical model to solve multi-objective trapezoidal fuzzy fractional programming problems
    Maharana, Sujit
    Nayak, Suvasis
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2024, 15 (06) : 2757 - 2771