Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining

被引:0
|
作者
Chen, Zhongqiang [1 ,2 ,3 ]
Song, Pingcheng [1 ]
Liu, Runhan [1 ]
Wang, Qi [1 ]
Shen, Yumeng [1 ]
机构
[1] Inner Mongolia Univ Technol, Sch Resources & Environm Engn, Hohhot 010051, Peoples R China
[2] Inner Mongolia Univ Technol, Inner Mongolia Engn Res Ctr Geol Technol & Geotech, Hohhot 010051, Peoples R China
[3] Inner Mongolia Univ Technol, Key Lab Geol Hazards & Geotech Engn Def Sandy & Dr, Hohhot 010051, Peoples R China
来源
SCIENTIFIC REPORTS | 2025年 / 15卷 / 01期
关键词
ore production scheduling strategy; Uncertainty optimization; NSGA-II-GRA; Weighted combination; Market price fluctuation; MINES; PERFORMANCE; UNCERTAINTY; ALGORITHMS;
D O I
10.1038/s41598-025-94775-8
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
To address the challenges posed by ore grade fluctuations, extraction cost variations, and market price instability in open-pit ore production strategies, an optimization model integrating a solution algorithm integrating dynamic simulation is proposed. First, Monte Carlo simulation is used to generate random variables, simulating ore grade and extraction cost fluctuations at different extraction points. Then, the Non-dominated Sorting Genetic Algorithm II with Grey Relational Analysis (NSGA-II-GRA) is employed for an initial solution to obtain the preliminary Pareto-optimal solution set. Furthermore, a market price fluctuation constraint equation is introduced during the optimization process to conduct a second iterative optimization of the initial solution set, generating optimized plans under different price fluctuation intervals. Finally, by integrating subjective and objective weights, the weighted grey relational analysis method is applied to select the optimal Ore Production Scheduling Strategy. The optimization results indicate that, while achieving the optimization objectives, calcium oxide grade and production target achievement rate increased by 7% and 7.17%, respectively, while ore output increased by 16.7% and 20.5% under different price fluctuation intervals.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Simultaneous Optimization of Final Pit and Production Schedule in Open-pit Coal Mines
    Gu Xiaowei
    Wang Pengfei
    Wang Qing
    Zheng Youyi
    Liu Jianping
    Chen Bin
    INNOVATION MANUFACTURING AND ENGINEERING MANAGEMENT, 2011, 323 : 222 - +
  • [32] Dynamic phase-mining optimization in open-pit metal mines
    顾晓薇
    王青
    葛舒
    TransactionsofNonferrousMetalsSocietyofChina, 2010, 20 (10) : 1974 - 1980
  • [33] Optimization of cycle time for loading and hauling trucks in open-pit mining
    Mnzool, Mohammed
    Almujibah, Hamad
    Bakri, Mudthir
    Gaafar, Ahmed
    Elhassan, Adil A. M.
    Gomaa, Ehab
    MINING OF MINERAL DEPOSITS, 2024, 18 (01): : 18 - 26
  • [34] Dynamic phase-mining optimization in open-pit metal mines
    Gu Xiao-wei
    Wang Qing
    Ge Shu
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 2010, 20 (10) : 1974 - 1980
  • [35] Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules
    Chung, Joyce
    Asad, Mohammad Waqar Ali
    Topal, Erkan
    RESOURCES POLICY, 2022, 77
  • [36] SELECTIVE OPEN-PIT MINING AND ORE TREATMENT AT CROYDON GOLD MINE, NORTH QUEENSLAND
    CHILD, R
    STAFFORD, G
    KANDEMIR, H
    NORTH QUEENSLAND GOLD 89 CONFERENCE: A CONFERENCE FOCUSED ON THE GOLD EXPLORATION, MINING AND PROCESSING INDUSTRY OF NORTH QUEENSLAND, 1989, : 141 - 153
  • [37] A new model for open-pit production and waste-dump scheduling
    Fu, Zhao
    Asad, Mohammad Waqar Ali
    Topal, Erkan
    ENGINEERING OPTIMIZATION, 2019, 51 (04) : 718 - 732
  • [38] Linear models for stockpiling in open-pit mine production scheduling problems
    Moreno, Eduardo
    Rezakhah, Mojtaba
    Newman, Alexandra
    Ferreira, Felipe
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (01) : 212 - 221
  • [39] MODELING MINING - OPEN-PIT COPPER PRODUCTION IN BRITISH-COLUMBIA
    BRADLEY, PG
    RESOURCES POLICY, 1980, 6 (01) : 44 - 59
  • [40] Stability analysis of slope under mining for resident ore body outside the open-pit
    Zhang Ya-Bin
    Gan De-Qing
    Chen Chao
    ROCK STRESS AND EARTHQUAKES, 2010, : 585 - 588