Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining

被引:0
|
作者
Chen, Zhongqiang [1 ,2 ,3 ]
Song, Pingcheng [1 ]
Liu, Runhan [1 ]
Wang, Qi [1 ]
Shen, Yumeng [1 ]
机构
[1] Inner Mongolia Univ Technol, Sch Resources & Environm Engn, Hohhot 010051, Peoples R China
[2] Inner Mongolia Univ Technol, Inner Mongolia Engn Res Ctr Geol Technol & Geotech, Hohhot 010051, Peoples R China
[3] Inner Mongolia Univ Technol, Key Lab Geol Hazards & Geotech Engn Def Sandy & Dr, Hohhot 010051, Peoples R China
来源
SCIENTIFIC REPORTS | 2025年 / 15卷 / 01期
关键词
ore production scheduling strategy; Uncertainty optimization; NSGA-II-GRA; Weighted combination; Market price fluctuation; MINES; PERFORMANCE; UNCERTAINTY; ALGORITHMS;
D O I
10.1038/s41598-025-94775-8
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
To address the challenges posed by ore grade fluctuations, extraction cost variations, and market price instability in open-pit ore production strategies, an optimization model integrating a solution algorithm integrating dynamic simulation is proposed. First, Monte Carlo simulation is used to generate random variables, simulating ore grade and extraction cost fluctuations at different extraction points. Then, the Non-dominated Sorting Genetic Algorithm II with Grey Relational Analysis (NSGA-II-GRA) is employed for an initial solution to obtain the preliminary Pareto-optimal solution set. Furthermore, a market price fluctuation constraint equation is introduced during the optimization process to conduct a second iterative optimization of the initial solution set, generating optimized plans under different price fluctuation intervals. Finally, by integrating subjective and objective weights, the weighted grey relational analysis method is applied to select the optimal Ore Production Scheduling Strategy. The optimization results indicate that, while achieving the optimization objectives, calcium oxide grade and production target achievement rate increased by 7% and 7.17%, respectively, while ore output increased by 16.7% and 20.5% under different price fluctuation intervals.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] COMPUTER-BASED OPTIMIZATION OF OPEN-PIT MINING SEQUENCES
    HUANG, SZ
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1993, 102 : A125 - A133
  • [22] Computer-based optimization of open-pit mining sequences
    Huang, Shuzhang
    Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 1993, 102 : 125 - 133
  • [23] Optimization-based dispatching policies for open-pit mining
    Smith, Amanda
    Linderoth, Jeff
    Luedtke, James
    OPTIMIZATION AND ENGINEERING, 2021, 22 (03) : 1347 - 1387
  • [24] A new methodology for the open-pit mine production scheduling problem
    Samavati, Mehran
    Essam, Daryl
    Nehring, Micah
    Sarker, Ruhul
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 81 : 169 - 182
  • [25] Open-Pit Mine Production Planning and Scheduling: A Research Agenda
    Samavati, Mehran
    Essam, Daryl L.
    Nehring, Micah
    Sarker, Ruhul
    DATA AND DECISION SCIENCES IN ACTION, 2018, : 221 - 226
  • [26] Production schedule optimization in open-pit coal mine
    Gu, Xiao-Wei
    Xu, Xiao-Chuan
    Wang, Qing
    Zheng, You-Yi
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (08): : 1184 - 1187
  • [27] A New Algorithm for the Open-Pit Mine Production Scheduling Problem
    Chicoisne, Renaud
    Espinoza, Daniel
    Goycoolea, Marcos
    Moreno, Eduardo
    Rubio, Enrique
    OPERATIONS RESEARCH, 2012, 60 (03) : 517 - 528
  • [28] THE USE OF A CAVED BLOCK AS AN ORE PASS AND ITS APPLICATION TO OPEN-PIT MINING
    WEED, HC
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1953, 196 (09): : 886 - 889
  • [29] Simultaneous stochastic optimization of an open-pit mining complex with preconcentration using reinforcement learning
    Levinson, Zachary
    Dimitrakopoulos, Roussos
    Keutchayan, Julien
    APPLIED SOFT COMPUTING, 2023, 138
  • [30] Production scheduling optimization in open pit mines
    Fytas, K.
    Hadjigeorgiou, J.
    Collins, J.L.
    International journal of surface mining & reclamation, 1993, 7 (01): : 1 - 9