Mitigating potential risk via counterfactual explanation generation in blast-based tunnel construction

被引:0
|
作者
Liu, Fenghua [1 ,2 ]
Liu, Wenli [1 ,2 ]
Liu, Jiajing [2 ,3 ]
Zhong, Botao [1 ,2 ]
Sun, Jun [1 ,2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, Wuhan 430074, Peoples R China
[2] Huazhong Univ Sci & Technol, Natl Ctr Technol Innovat Digital Construct, Wuhan 430074, Hubei, Peoples R China
[3] Hunan Univ, Coll Civil Engn, Key Lab Damage Diag Engn Struct Hunan Prov, Changsha 410082, Peoples R China
基金
中国国家自然科学基金;
关键词
Risk mitigation; Counterfactual explanations; Explainable artificial intelligence; Tunnel construction; Data augmentation; PARAMETERS; OVERBREAK;
D O I
10.1016/j.aei.2025.103227
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Machine learning and deep learning have significantly enhanced the ability to mitigate risks in blast-based tunnel construction. However, most studies fall short in model constraints, data quality, and explainability, making nonrobust risk mitigation strategies. Therefore, this study aims to investigate the following questions: how to accurately assess risk for blast-based tunnel construction using limited data, and develop effective risk mitigation strategies? This research leverages counterfactual explanation generation, a key technique of explainable artificial intelligence, along with data augmentation to develop a framework for guiding risk mitigation, which includes: (1) a two-stage data augmentation technique to address data shortage and imbalance; (2) a novel counterfactual explanation generation algorithm to optimize blasting parameters and reduce risk; and (3) a post-hoc explainable approach to provide insights on feature importance. A railway tunnel in Hubei is conducted as a case study to test the validity of the proposed method. The results show that the proposed method accurately predict overbreak, achieving the highest R2 (0.883) and the lowest RMSE (1.335) compared to baseline models. Additionally, it effectively optimizes the blasting parameters to mitigate risk, reducing the average overbreak in six scenarios. The explainable analytic identifies key factors (e.g., periphery hole spacing) influencing construction risk, thereby enhancing personnel's understanding of complex construction systems.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] A Risk Assessment Method for Metro Shield Tunnel Construction Based on Interval Number
    Zhang, Yeqin
    Zhang, Jiaming
    Guo, Hailin
    Zhou, Yang
    Ma, Guofu
    Wang, Cong
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (05) : 4793 - 4809
  • [22] AN EVIDENCE-BASED RISK DECISION SUPPORT APPROACH FOR METRO TUNNEL CONSTRUCTION
    Guo, Yifan
    Zheng, Junjie
    Zhang, Rongjun
    Yang, Youbin
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (05) : 377 - 396
  • [23] Risk assessment of gas disaster in tunnel construction based on unascertained measurement theory
    Zhai, Qiang
    Gu, Weihong
    Zhao, Yingying
    Journal of Railway Science and Engineering, 2021, 18 (03) : 803 - 812
  • [24] Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
    Wang, Jing-chun
    Liu, Jia-qi
    Wei, Qiang
    Wang, Peng
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (01): : 203 - 210
  • [25] Comparison and selection of construction method for subsea tunnel based on risk coefficient method
    1600, Editorial By Modern Tunnelling Technology, China (51):
  • [26] A Risk Assessment Method for Metro Shield Tunnel Construction Based on Interval Number
    Yeqin Zhang
    Jiaming Zhang
    Hailin Guo
    Yang Zhou
    Guofu Ma
    Cong Wang
    Geotechnical and Geological Engineering, 2020, 38 : 4793 - 4809
  • [27] Risk assessment and management via multi-source information fusion for undersea tunnel construction
    Zhou, Hong
    Zhao, Yinghui
    Shen, Qiang
    Yang, Liu
    Cai, Hubo
    AUTOMATION IN CONSTRUCTION, 2020, 111
  • [28] Mitigating hydrologic financial risk in hydropower generation using index-based financial instruments
    Foster, Benjamin T.
    Kern, Jordan D.
    Characklis, Gregory W.
    WATER RESOURCES AND ECONOMICS, 2015, 10 : 45 - 67
  • [29] Efficiency of risk management for tunnel security of megaprojects construction in China based on system dynamics
    Liu, Kai
    Liu, Yuming
    Kou, Yuanyuan
    Yang, Xiaoxu
    Hu, Guangzhong
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024, 23 (02) : 712 - 724
  • [30] BIM-based digital platform and risk management system for mountain tunnel construction
    Naifei Liu
    Desai Guo
    Zhanping Song
    Shiming Zhong
    Ruoqi Hu
    Scientific Reports, 13