Optimization of operating performance of the new 252MW steam generator including its milling and firing plant in the hew heating power plant tiepstack

被引:0
|
作者
Grossterlinden, F.-W.
Hellmer, R.
Rennert, K.-D.
Thierbach, H.-U.
机构
来源
VGB Kraftwerkstechnik | 1995年 / 75卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 4 条
  • [1] Natural Gas Firing of the 600-MW Steam Generator at the Meppen Power Plant.
    Reidick, H.
    VGB Kraftwerkstechnik, 1976, 56 (06): : 383 - 388
  • [2] Performance evaluation of once-through steam generator of a 626 MW supercritical oil-fired steam power plant under a variable operating load
    Mohamed, Karim Abd El-Hakam A.
    Hassan, Ali Ahmed Mohamed
    Maghrabie, Hussein M.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2023,
  • [3] PERFORMANCE-CHARACTERISTICS OF A WATER-IN-OIL-FIRED STEAM-GENERATOR FOR A 300-MW POWER-PLANT
    MORCOS, VH
    ENERGY, 1995, 20 (10) : 1055 - 1066
  • [4] IK-SPSA-Based Performance Optimization Strategy for Steam Generator Level Control System of Nuclear Power Plant
    Geng, Pengcheng
    Kong, Xiangsong
    Shi, Changqing
    Liu, Hang
    Liu, Jiabin
    ENERGIES, 2022, 15 (19)