共 11 条
- [1] Mathematic model and simulation of steam generator in 900 MW supercritical once-through boiler Dongli Gongcheng/Power Engineering, 2005, 25 (03): : 335 - 338
- [2] DESIGNING OF LARGE CAPACITY SUPERCRITICAL ONCE-THROUGH STEAM GENERATOR FOR VARIABLE PRESSURE OPERATION. IHI Engineering Review (English Edition), 1982, 15 (01): : 23 - 30
- [3] Control Laws for a Linear Fresnel Reflector Solar Steam Generator in Once-Through Mode on a Commercial Operating Power Plant JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME, 2019, 141 (03):
- [4] Performance Analysis and Tube Inlet Orifice Length Evaluation of a Once-Through Steam Generator XII INTERNATIONAL CONFERENCE ON COMPUTATIONAL HEAT, MASS AND MOMENTUM TRANSFER (ICCHMT 2019), 2019, 128
- [8] FEATURES OF HEAT TRANSFER STUDY OF TWO-PHASE FLOW IN FURNACE WALL TUBE FOR VARIABLE PRESSURE OPERATION SUPERCRITICAL ONCE-THROUGH STEAM GENERATOR. IHI Engineering Review (English Edition), 1982, 15 (01): : 31 - 38
- [9] Several issues encountered during the implementation of a domestic production-oriented modification design of Japanese-made small-sized once-through oil-fired steam boilers Reneng Dongli Gongcheng/Journal of Engineering for Thermal Energy and Power, 2000, 15 (04): : 390 - 392