共 50 条
- [41] DESIGN AND PRODUCTION FEATURES OF A SINGLE CONNECTOR INTERCONNECTION SYSTEM. Insulation/Circuits, 1975, 21 (05): : 39 - 41
- [42] Grasp Planning for Flexible Production with Small Lot Sizes based on CAD models using GPIS and Bayesian Optimization 2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, : 879 - 884
- [43] Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems Production Planning and Control, 1998, 9 (04): : 371 - 384
- [46] OUTLINE REQUIREMENTS FOR A PRODUCTION PLANNING AND CONTROL SYSTEM FOR A FOUNDRY. Foundryman, 1983, 76 (pt 4): : 56 - 59
- [47] STUDY OF EMERGENCY ORDER PROCESS STARTING TIME IN A SINGLE-STAGE MULTI-PRODUCT PRODUCTION SYSTEM. Modelling, Measurement and Control C, 1985, 2 (02): : 7 - 23
- [48] Production to order with random yields: single-stage multiple lot-sizing IIE Transactions (Institute of Industrial Engineers), 1996, 28 (08): : 669 - 676