共 50 条
- [1] PRODUCTION PLANNING AND OPTIMIZATION MODEL FOR AN ALUMINIUM SMELTER FOUNDRY. Aluminium (English Edition), 1983, 59 (07):
- [4] Planning of a Turnkey Foundry, Illustrated by the Example of a Fittings Foundry. Giesserei, 1979, 66 (19): : 690 - 697
- [6] FOUNDRY 4.0. Digitization in foundry. Process control and non quality costs METALLURGIA ITALIANA, 2017, (04): : 57 - 57
- [7] SUCCESSFUL CHANNEL INJECTION SYSTEM AT EAST MIDLANDS ALUMINIUM FOUNDRY. Foundry Trade Journal, 1975, 138 (3039):
- [8] Use of a Nondestructive Testing Method for Quality Control in a Light Metal Foundry. Giessereitechnik, 1973, 19 (06): : 183 - 187
- [9] Requirements Imposed on Availability Planning of Tools in a Production Control System. Werkstatt und Betrieb, 1988, 121 (02): : 133 - 136