Decision making of project under fuzzy information

被引:0
|
作者
Wang, Kuo-Shong [1 ]
Chi, Jen-Hao [1 ]
Wan, Eang-Hao [1 ]
机构
[1] Natl Central Univ, Chungli, Taiwan
关键词
Critical path analysis - Decision support systems - Fuzzy sets - Risk assessment - Scheduling - Strategic planning;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, fuzzy decision of resource-constrained project planning are made. The resources are classified into renewable and non-renewable types. The activities in the project may have alternative modes depending upon the dispatching, subcontracting, new techniques employed, etc. Thus, the resource requirements for each mode are different. Also, the duration of each mode is assumed to have a fuzzy character. Based on accepted risk level and the multi-objective management perspectives (completion time and cost), the mode suitable for each activity to perform the project is decided by the preliminary screening, feasible screening and priority making stages. During the analysis, the risk level is defined by α-cuts of completion time and cost. In the preliminary screening stage, the candidates of mode for each activity are chosen by the time limitation in the critical path and the requirements of non-renewable resource. In the feasible screening stages, the accepted mode-combination of the activities are chosen by the requirements of the renewable resources and by the completion time. Then the priority is decided by the fuzzy ordering in the final stage. Typical examples at different accepted risk levels are presented.
引用
收藏
页码:533 / 541
相关论文
共 50 条
  • [1] Uncertain decision making under fuzzy information
    Song, Y.
    Wu, X.
    Zheng, Z.
    Chen, M.
    Huazhong Ligong Daxue Xuebao/Journal Huazhong (Central China) University of Science and Technology, 2001, 29 (10): : 37 - 40
  • [2] On Decision Making under Fuzzy Information about an Uncontrolled Factor
    Ukhobotov, V. I.
    Stabulit, I. S.
    Kudryavtsev, K. N.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 524 - 531
  • [3] Hesitant Fuzzy Group Decision Making Under Incomplete Information
    Lv, Jin-hui
    Guo, Si-zong
    FUZZY INFORMATION AND ENGINEERING AND DECISION, 2018, 646 : 91 - 101
  • [4] DECISION-MAKING IN FUZZY ENVIRONMENT FUZZY INFORMATION AND DECISION-MAKING
    TANAKA, H
    OKUDA, T
    ASAI, K
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (06) : 623 - 635
  • [5] Project investment decision making with fuzzy information: A literature review of methodologies based on taxonomy
    Dong, Ming-Gao
    Li, Shou-Yi
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3239 - 3252
  • [6] An Entropy Method for Fuzzy Group Decision-making Problems under Fuzzy Random Information
    Gao Yan
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2013, 43 (13): : 224 - 231
  • [7] INFORMATION SYSTEMS OUTSOURCING DECISIONS UNDER FUZZY GROUP DECISION MAKING APPROACH
    Nazari-Shirkouhi, S.
    Ansarinejad, A.
    Miri-Nargesi, S. S.
    Dalfard, V. Majazi
    Rezaie, K.
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2011, 10 (06) : 989 - 1022
  • [8] Fuzzy optimality based decision making under imperfect information without utility
    Rafik A. Aliev
    Witold Pedrycz
    Akif V. Alizadeh
    Oleg H. Huseynov
    Fuzzy Optimization and Decision Making, 2013, 12 : 357 - 372
  • [9] Fuzzy optimality based decision making under imperfect information without utility
    Aliev, Rafik A.
    Pedrycz, Witold
    Alizadeh, Akif V.
    Huseynov, Oleg H.
    FUZZY OPTIMIZATION AND DECISION MAKING, 2013, 12 (04) : 357 - 372
  • [10] DECISION MAKING IN WATER RESOURCES WITH FUZZY INFORMATION
    Tzimopoulos, C.
    Evangelides, C.
    GLOBAL NEST JOURNAL, 2011, 13 (04): : 317 - 324