Decision making of project under fuzzy information

被引:0
|
作者
Wang, Kuo-Shong [1 ]
Chi, Jen-Hao [1 ]
Wan, Eang-Hao [1 ]
机构
[1] Natl Central Univ, Chungli, Taiwan
关键词
Critical path analysis - Decision support systems - Fuzzy sets - Risk assessment - Scheduling - Strategic planning;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, fuzzy decision of resource-constrained project planning are made. The resources are classified into renewable and non-renewable types. The activities in the project may have alternative modes depending upon the dispatching, subcontracting, new techniques employed, etc. Thus, the resource requirements for each mode are different. Also, the duration of each mode is assumed to have a fuzzy character. Based on accepted risk level and the multi-objective management perspectives (completion time and cost), the mode suitable for each activity to perform the project is decided by the preliminary screening, feasible screening and priority making stages. During the analysis, the risk level is defined by α-cuts of completion time and cost. In the preliminary screening stage, the candidates of mode for each activity are chosen by the time limitation in the critical path and the requirements of non-renewable resource. In the feasible screening stages, the accepted mode-combination of the activities are chosen by the requirements of the renewable resources and by the completion time. Then the priority is decided by the fuzzy ordering in the final stage. Typical examples at different accepted risk levels are presented.
引用
收藏
页码:533 / 541
相关论文
共 50 条
  • [21] A Novel Risk Decision Making Based on Decision-Theoretic Rough Sets Under Hesitant Fuzzy Information
    Liang, Decui
    Liu, Dun
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2015, 23 (02) : 237 - 247
  • [22] Models for decision making problems with hesitant fuzzy information
    Zhang, Yi
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 27 (02) : 839 - 847
  • [23] Information fusion for intuitionistic fuzzy decision making: An overview
    Xu, Zeshui
    Zhao, Na
    INFORMATION FUSION, 2016, 28 : 10 - 23
  • [24] Group decision making fuzzy evaluation for large infrastructure project
    Han, Chuanfeng
    Chen, Jianye
    Tongji Daxue Xuebao/Journal of Tongji University, 2007, 35 (01): : 133 - 137
  • [25] A stratified fuzzy decision-making approach for engineering procurement construction project quality evaluation with triangular fuzzy neutrosophic information
    Lei, Yong
    INTERNATIONAL JOURNAL OF KNOWLEDGE-BASED AND INTELLIGENT ENGINEERING SYSTEMS, 2024, 28 (01) : 179 - 194
  • [26] A New Group Decision-Making Technique under Picture Fuzzy Soft Expert Information
    Tchier, Fairouz
    Ali, Ghous
    Gulzar, Muhammad
    Pamucar, Dragan
    Ghorai, Ganesh
    ENTROPY, 2021, 23 (09)
  • [27] Group decision-making for the selection of an antivirus mask under fermatean fuzzy soft information
    Shahzadi, Gulfam
    Akram, Muhammad
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 40 (01) : 1401 - 1416
  • [28] Study on Multi-attribute Group Decision Making Under the Information of Linguistic Fuzzy Numbers
    Wang, Cheng
    Peng, Jin
    Li, Ping
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 7496 - 7499
  • [29] Extensions of Dombi Aggregation Operators for Decision Making under m-Polar Fuzzy Information
    Akram, Muhammad
    Yaqoob, Naveed
    Ali, Ghous
    Chammam, Wathek
    JOURNAL OF MATHEMATICS, 2020, 2020
  • [30] Novel Decision Making Methodology under Pythagorean Probabilistic Hesitant Fuzzy Einstein Aggregation Information
    Ashraf, Shahzaib
    Batool, Bushra
    Naeem, Muhammad
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2023, 136 (02): : 1785 - 1811