Water and wastewater minimization: the Aire and Calder project

被引:0
|
作者
Edwards, A.M.C. [1 ]
Johnston, N. [1 ]
机构
[1] Environment Agency, Leeds, United Kingdom
关键词
Costs - Environmental protection - Project management - Rivers - Wastewater disposal - Wastewater treatment - Water conservation;
D O I
暂无
中图分类号
学科分类号
摘要
The reduction of the waste of raw materials at source using clean technologies, recycling, and good housekeeping has considerable benefits for both the environment and industry. A demonstration project on wastewater minimization was completed in 1995 in the Aire and Calder catchments of West Yorkshire. The findings indicated cost savings for eleven firms of over £3 million/annum and further opportunities which, when implemented, could realize another £1 million/annum. The reduction in the amount of wastewater discharged either to sewer or river was 27%, with a potential to increase to over 40%. The payback period for 63% of the waste minimization opportunities is less than one year and many involve only a small initial investment. Waste minimization when widely adopted has prospects for cutting industry's costs, reducing demand for water and reducing the volume of effluent produced.
引用
收藏
页码:227 / 234
相关论文
共 50 条
  • [31] PROCESS INTEGRATION IN THE BLEACHING SECTION OF A PAPER MILL FOR MINIMIZATION OF FRESH WATER CONSUMPTION AND WASTEWATER GENERATION
    Shukla, Sudheer Kumar
    Kumar, Deepak
    Kumar, Vivek
    Pandey, Mukesh
    Bansal, Mukesh Chandra
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2013, 12 (12): : 2435 - 2442
  • [32] Industrial wastewater minimization using water pinch analysis: a case study on an old textile plant
    Ujang, Z
    Wong, CL
    Manan, ZA
    WATER SCIENCE AND TECHNOLOGY, 2002, 46 (11-12) : 77 - 84
  • [33] Changi wastewater project
    Frech, Hans-Martin
    Concrete Engineering International, 2004, 8 (04):
  • [34] Water industry focus: Treatment - Clean Aire act
    Nathan, S
    PROCESS ENGINEERING, 1998, 79 (06) : 37 - 37
  • [35] Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects
    Shdid, Caesar Abi
    Andary, Elie
    Chowdhury, Arindam Gan
    Ahmad, Irtishad U.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (02)
  • [36] Contract Payment Provisions and Project Performance: An Analysis of Municipal Water and Wastewater Facilities
    Bogus, Susan M.
    Shane, Jennifer S.
    Molenaar, Keith R.
    PUBLIC WORKS MANAGEMENT & POLICY, 2010, 15 (01) : 20 - 31
  • [37] Depoliticising Poor Water Quality: Ambiguous Agreement in a Wastewater Reuse Project in Morocco
    Ennabih, Amal
    MayauX, Pierre-Louis
    WATER ALTERNATIVES-AN INTERDISCIPLINARY JOURNAL ON WATER POLITICS AND DEVELOPMENT, 2020, 13 (02): : 266 - 285
  • [38] Integrated project delivery implementation framework for water and wastewater treatment plant projects
    Andary, Elie Georges
    Shdid, Caesar Abi
    Chowdhury, Arindam
    Ahmad, Irtishad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (03) : 609 - 633
  • [39] WATER-QUALITY MANAGEMENT IN THE RIVER CALDER CATCHMENT
    HUDSON, JA
    MORRIS, J
    SWANWICK, KH
    JOURNAL OF THE INSTITUTION OF WATER AND ENVIRONMENTAL MANAGEMENT, 1988, 2 (05): : 505 - 512
  • [40] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174