共 50 条
- [42] One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs Int J Prod Econ, 2 (213-219):
- [46] A Stronger Complexity Result for the Single Machine Multi-Operation Jobs Scheduling Problem to Minimize the Number of Tardy Jobs Journal of Scheduling, 2003, 6 : 551 - 555
- [49] Algorithms for a two-agent single machine scheduling problem to minimize weighted number of tardy jobs JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2021, 42 (04): : 785 - 811