共 50 条
- [21] Simple heuristic to minimize total tardiness in a single machine scheduling problem The International Journal of Advanced Manufacturing Technology, 2006, 30 : 722 - 726
- [22] Simple heuristic to minimize total tardiness in a single machine scheduling problem International Journal of Advanced Manufacturing Technology, 2006, 30 (7-8): : 722 - 726
- [27] Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs Computers and Operations Research, 1995, 22 (02): : 205 - 219
- [30] A heuristic for scheduling on nonidentical machines to minimize tardy jobs INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (03): : 188 - 194