ORCHID - A COMPUTER SIMULATION OF THE RELIABILITY OF AN NDE INSPECTION SYSTEM.

被引:0
|
作者
Moles, M.D.C. [1 ]
机构
[1] Ontario Hydro Research Div, Toronto,, Ont, Can, Ontario Hydro Research Div, Toronto, Ont, Can
关键词
COMPUTER SIMULATION - EDDY CURRENTS - NONDESTRUCTIVE EXAMINATION - PIPELINES - Inspection - ULTRASONIC APPLICATIONS;
D O I
10.1007/BF00566694
中图分类号
学科分类号
摘要
CANDU pressurized heavy water reactors contain several hundred horizontally-mounted zirconium alloy pressure tubes. Following a pressure tube failure, a pressure tube inspection system called CIGARette was rapidly designed, manufactured and put in operation. Defects called hydride blisters were found to be the cause of the failure, and were detected using a combination of eddy current and ultrasonic scans. A number of improvements were made to CIGARette during the inspection period. The ORCHID computer program models the operation of the delivery system, eddy current and ultrasonic systems by imitating the on-reactor decision-making procedure. ORCHID predicts that during the early stage of development, less than one blistered tube in three would be detected, while less than one in two would be detected in the middle development stage. However, ORCHID predicts that during the late development stage, probability of detection will be over 90%, primarily due to the inclusion of axial ultrasonic scans (a procedural modification). Rotational and axial slip could severely reduce probability of detection.
引用
收藏
页码:23 / 31
相关论文
共 50 条
  • [31] Water-methanol-benzene ternary system. Thermochemical experiment and computer simulation
    Bushuev Yu.G.
    Korolev V.P.
    Journal of Structural Chemistry, 2006, 47 (Suppl 1) : S66 - S72
  • [32] MANUFACTURING PIECE PART INSPECTION DESIGN SYSTEM.
    Schumann Jr., P.A.
    Valentino, C.R.
    IBM Technical Disclosure Bulletin, 1973, 16 (05): : 1628 - 1629
  • [33] REPEATABILITY OF TREES ROTOR BORE INSPECTION SYSTEM.
    Ammirato, F.V.
    Electric Power Research Institute (Report) EPRI NP, 1982,
  • [34] FACTORS INVOLVED IN CHOOSING AN AUTOMATIC INSPECTION SYSTEM.
    Hall, Gerard
    Electri-onics, 1987, 33 (14): : 25 - 27
  • [35] AUTOMATIC BILLET INSPECTION BY INDUSTRIAL TV SYSTEM.
    Hinami, Michiteru
    Ishiyama, Mikio
    Yoshimura, Osamu
    Natsubara, Noriyuki
    Kido, Yasunori
    Tanaka, Yoshito
    Sumitomo Metals, 1976, 28 (02): : 7 - 12
  • [36] SUBWAY CAR INSPECTION AND REPAIR MANAGEMENT SYSTEM.
    Mochizuki, Masaichi
    Japanese Railway Engineering, 1978, 17 (04): : 12 - 13
  • [37] TIRAK STAPLE SHAFT AND BUNKER INSPECTION SYSTEM.
    Williams, K.
    Hewer, B.
    Mining Technology, 1987, 69 (795): : 9 - 11
  • [38] OPTIMAL INSPECTION AND REPLACEMENT POLICY FOR A DETERIORATING SYSTEM.
    Ohnishi, Masamitsu
    Kawai, Hajime
    Mine, Hisashi
    1600, (23):
  • [39] TOSHIBA AUTOMATIC RAILWAY TICKET INSPECTION SYSTEM.
    Hoshina, Norihisa
    Noguchi, Kiyoshi
    Toshiba Review, 1972, (73): : 7 - 12
  • [40] Use of simulation in the NDE qualification process in France: application to the EPR RPV inspection
    Fasham, J. C.
    Toth, R.
    Truchetti, L.
    Bouveret, Y.
    Sornique, O.
    INSIGHT, 2010, 52 (12) : 652 - 656