共 50 条
- [22] Requirements for a 20 year campaign at Dofasco's No. 4 blast furnace AISE Steel Technology, 2001, 78 (01): : 58 - 62
- [23] Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2000, 97 (7-8): : 887 - 896
- [25] Performance of a multi-junction radial thermocouple on blast furnace No. 1 in 2005 Metallurgist, 2007, 51 : 145 - 147
- [27] BLAST-FURNACE BOSH AND STACK REPAIRS DURING A CAMPAIGN - AN OFF-THE-RECORD PANEL DISCUSSION IRON AND STEEL ENGINEER, 1983, 60 (09): : P81 - P81
- [29] Relining, upgrading and improved environmental conditions of Rogesa's blast furnace No. 4 STAHL UND EISEN, 2006, 126 (01): : 55 - 62
- [30] Construction of No. 6 blast furnace for BHP steel Iron and Steel Engineer, 1998, 75 (01): : 29 - 33