共 50 条
- [42] A New Crossover Operator for Single Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times GAZI UNIVERSITY JOURNAL OF SCIENCE, 2012, 25 (01): : 127 - 136
- [43] Minimizing total weighted tardiness on a single machine with sequence-dependent setup and future ready time The International Journal of Advanced Manufacturing Technology, 2013, 67 : 281 - 294
- [47] Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem Journal of Scheduling, 2016, 19 : 191 - 205
- [48] Single-machine scheduling problem to minimize total tardiness subject to minimum number of tardy jobs IIE Transactions (Institute of Industrial Engineers), 1995, 27 (02): : 250 - 256
- [49] Algorithms for single-machine scheduling to minimize the total tardiness with learning effects and two competing agents CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2015, 23 (01): : 13 - 26