Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness

被引:0
|
作者
Sun, Xiaoqing [1 ]
Noble, James S. [2 ]
Klein, Cerry M. [1 ]
机构
[1] Sabre Group, M D 5547, 4333 Amon Carter Blvd, Fort Worth, TX 76155, United States
[2] Department of Industrial and Manufacturing Systems Engineering, University of Missouri- Columbia, E3437 Engineering Building East, Columbia, MO 65211, United States
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:113 / 124
相关论文
共 50 条
  • [21] An enhanced dynasearch neighborhood for the single-machine total weighted tardiness scheduling problem
    Grosso, A
    Della Croce, F
    Tadei, R
    OPERATIONS RESEARCH LETTERS, 2004, 32 (01) : 68 - 72
  • [22] Single-machine scheduling with deadlines to minimize the total weighted late work
    Chen, Rubing
    Yuan, Jinjiang
    Ng, C. T.
    Cheng, T. C. E.
    NAVAL RESEARCH LOGISTICS, 2019, 66 (07) : 582 - 595
  • [23] Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents
    Lee, Wen-Chiung
    Shiau, Yau-Ren
    Chung, Yu-Hsiang
    Ding, Lawson
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [24] Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines
    Rubing Chen
    Jinjiang Yuan
    Journal of Scheduling, 2019, 22 : 595 - 601
  • [25] An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem
    Congram, RK
    Potts, CN
    van de Velde, SL
    INFORMS JOURNAL ON COMPUTING, 2002, 14 (01) : 52 - 67
  • [26] Parallel Algorithm with Blocks for a Single-Machine Total Weighted Tardiness Scheduling Problem
    Uchronski, Mariusz
    APPLIED SCIENCES-BASEL, 2021, 11 (05): : 1 - 17
  • [27] Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines
    Chen, Rubing
    Yuan, Jinjiang
    JOURNAL OF SCHEDULING, 2019, 22 (05) : 595 - 601
  • [28] Meta-heuristics for the single-machine scheduling total weighted tardiness problem
    Madureira, Ana Maria
    Proceedings of the IEEE International Symposium on Assembly and Task Planning, 1999, : 405 - 410
  • [29] Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard
    Wan, Long
    Yuan, Jinjiang
    OPERATIONS RESEARCH LETTERS, 2013, 41 (04) : 363 - 365
  • [30] Scheduling hybrid flowshop with sequence-dependent setup times and due windows to minimize total weighted earliness and tardiness
    Khare, Ankit
    Agrawal, Sunil
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 135 : 780 - 792