共 50 条
- [41] Optimizing the BOF scrap charge at Bethlehem steel's sparrows point division 85TH STEELMAKING CONFERENCE PROCEEDINGS, 2002, 85 : 555 - 572
- [43] Recent improvements in wrought railroad wheel production at Standard Steel Proceedings of the IEEE/ASME Joint Railroad Conference, 2000, : 63 - 66
- [44] IMPROVEMENTS IN PRODUCTION OF EI 814 MARAGING-STEEL STRIP STEEL IN THE USSR, 1971, 1 (11): : 912 - &
- [46] Enhancement of BOF productivity through modification of hot metal transfer ladle lining at durgapur steel plant SEAISI Quarterly (South East Asia Iron and Steel Institute), 2009, 38 (01): : 39 - 42
- [47] An attempt to enhance BOF productivity - Role of hot metal transfer ladle lining at Durgapur steel plant Mater. Sci. Technol. Conf. Exhib., MST, (1668-1673):
- [50] Improvement of converter operation at POSCO's no. 1 BOF shop; by applying a variable blow pattern SEAISI Quarterly (South East Asia Iron and Steel Institute), 2000, 29 (04): : 48 - 53