共 50 条
- [31] Secondary fume control system at Ispat Inland's no. 4 BOF shop AISE Steel Technology, 2000, 77 (04): : 38 - 41
- [32] PRODUCTION OF HIGH CARBON CHROMIUM BEARING STEEL IN BOF-CC PROCESS. Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 1987, 73 (03): : 513 - 519
- [33] Research on Production Process of Weathering Steel Produced by BOF-CSP Line of WISCO JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 452 - 459
- [34] PRODUCTION OF HIGH CARBON-CHROMIUM BEARING STEEL IN BOF-CC PROCESS TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S262 - S262
- [35] Production plan schedule for the casting-rolling process in BOF special steel plants Beijing Keji Daxue Xuebao, 2008, 5 (566-570):
- [36] Material Metabolism and Environmental Emissions of BF-BOF and EAF Steel Production Routes MINERAL PROCESSING AND EXTRACTIVE METALLURGY REVIEW, 2018, 39 (01): : 50 - 58
- [37] PRODUCTION OF HIGH-CARBON CHROMIUM BEARING STEEL IN BOF-CC PROCESS TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (03): : 513 - 519
- [38] PRODUCTION OF HIGH-CARBON CHROMIUM BEARING STEEL BY BOF-CC PROCESS TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1008 - 1008
- [39] PRODUCTION OF BLAST FURNACE AND SINTER PLANT F9LUX AND BOF LIME JOURNAL OF METALS, 1967, 19 (06): : 86 - &