共 50 条
- [1] Improvements for higher productivity of BOF in Kashima No. 2 Steel making plant PROCEEDINGS OF THE FIRST AUSTRALIA-CHINA-JAPAN SYMPOSIUM ON IRON AND STEELMAKING, 2006, : 199 - +
- [5] HOW AHMSA BUILT A LOW COST STEEL PLANT - PRODUCTION RATE INCREASED 17 TIMES IN 24 YEARS BLAST FURNACE AND STEEL PLANT, 1969, 57 (02): : 114 - &
- [7] BOF lance life improvements at no. 3 SP of ArcelorMittal Indiana Harbor 2018, Iron and Steel Society (15):
- [8] Purging plugs for steel ladles - Laboratory and plant results from a BOF steel plant UNIFIED INTERNATIONAL TECHNICAL CONFERENCE ON REFRACTORIES (UNITECR 97), VOL 1 - 3: 5TH BIENNIAL WORLDWIDE CONGRESS - REFRACTORIES, A WORLDWIDE TECHNOLOGY, 1997, : 143 - 152
- [9] BOF tap hole sleeve improvements at Bethlehem Steel, Sparrows Point division 79TH STEELMAKING CONFERENCE PROCEEDINGS, 1996, 79 : 451 - 455
- [10] Continuous improvements in sinter production at Siderar's Sinter Plant 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 919 - 925