Development of the Design of a Boiler for a 500 MW Power Unit.

被引:0
|
作者
Ovchar, V.G.
Sotnikov, I.A.
Aizen, Kh.K.
Petrov, E.V.
机构
来源
Teploenergetika | 1980年 / 05期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
BOILERS
引用
收藏
页码:34 / 38
相关论文
共 50 条
  • [42] DESIGN OF 500 MW SEMIPEAK-LOAD STEAM-TURBINE GENERATING UNIT
    KAPLUN, SM
    POPYRIN, LS
    CHERNETSKII, NS
    THERMAL ENGINEERING, 1975, 22 (05) : 11 - 16
  • [43] HIGHLY EFFICIENT POWER-GENERATING UNIT.
    Gorshkov, A.S.
    Komarov, N.F.
    Shvarts, A.L.
    Godik, I.B.
    Thermal Engineering (English translation of Teploenergetika), 1987, 34 (05): : 258 - 261
  • [44] Predetermination of the Dynamic Behavior of a Power Plant Unit.
    Franke, J.
    Eitelberg, E.
    Kallina, G.
    Weber, H.
    Witte, U.
    VGB Kraftwerkstechnik, 1979, 59 (02): : 124 - 128
  • [45] APPLICATION OF FUZZY DECISIONS IN OPERATING A POWER UNIT.
    Carlan, M.R.
    Filip, Argentina
    Economic Computation and Economic Cybernetics Studies and Research, 1985, 20 (03): : 69 - 74
  • [46] MODERNIZING THE POWER-CONTROL SYSTEM IN A 300 MW POWER-GENERATING UNIT WITH A TGMP-324 BOILER
    DUBOV, VN
    BURLAKOV, AV
    MELAMED, AD
    ZISKAND, GA
    THERMAL ENGINEERING, 1989, 36 (10) : 550 - 553
  • [47] Burning of high-ash Ekibastuz coal in the boiler furnace of 300-500 MW power units
    Kvrivishvili, A. R.
    Tsepenok, A. I.
    Serant, F. A.
    Gordeev, V. V.
    Mezhov, E. A.
    Lavrinenko, A. A.
    CLEANER COMBUSTION AND SUSTAINABLE WORLD, 2012, : 717 - 721
  • [48] Seal design for a 300 mw utility boiler
    Yuan, M.-Y.
    Zhu, H.
    Liu, D.-Z.
    Reneng Dongli Gongcheng/Journal of Engineering for Thermal Energy and Power, 2001, 16 (02): : 216 - 217
  • [49] FIRESIDE CORROSION OF REHEATER TUBES - 500 MW COAL FIRED BOILER
    WRIGHT, D
    MITCHELL, PJ
    ASTON, J
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1981, 34 (04): : 174 - 174
  • [50] EVALUATION OF OPERATION OF OPVZ-185EG HEAD CIRCULATION PUMPS OF AN 800 MW POWER GENERATING UNIT.
    Rogovoi, T.N.
    Kikish, O.V.
    Soviet power engineering, 1981, 10 (05): : 725 - 734