Development of the Design of a Boiler for a 500 MW Power Unit.

被引:0
|
作者
Ovchar, V.G.
Sotnikov, I.A.
Aizen, Kh.K.
Petrov, E.V.
机构
来源
Teploenergetika | 1980年 / 05期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
BOILERS
引用
收藏
页码:34 / 38
相关论文
共 50 条
  • [31] Efficacy of Automation of the Calculation and Analysis of Technical and Economic Performance of a Boiler Unit.
    Rinkus, E.K.
    Koretskii, A.S.
    Oster-Miller, Yu.R.
    Teploenergetika, 1979, (08): : 35 - 37
  • [32] THE DESIGN OF POWER HANDLING FACILITIES ON 500-MW UNITS IN THE GDR
    PFEIFFER, G
    LIEBSCHER, K
    ENERGIETECHNIK, 1984, 34 (12): : 472 - 475
  • [33] Nonlinear boiler model of 300MW power unit for system dynamic performance studies
    Liu, CL
    Liu, JZ
    Niu, YG
    Liang, WP
    ISIE 2001: IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS PROCEEDINGS, VOLS I-III, 2001, : 1296 - 1300
  • [34] A Multizone Model of an Economizer in a 600 MW Boiler Unit
    Wang Jizhou
    Zhang Yanping
    Li Yu
    Huang Shuhong
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2012, 134 (04):
  • [35] Optimization of Starting Conditions of a 500 MW Power Unit with a K-500-240-2 Turbine.
    Pokhoriler, V.L.
    Palei, V.A.
    Danilov, S.N.
    Fiskind, E.E.
    Teploenergetika, 1985, (04): : 51 - 55
  • [36] RESEARCH AND DESIGN OF 1000 MW ULTRA-SUPERCRITICAL UNIT BOILER FEED PUMP TURBINE
    Zhang, Yuanlin
    Pan, Jiacheng
    Zhang, Jian
    Zhang, Qiong
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 3, 2009, : 359 - 364
  • [37] REGULATING RESUPERHEATED STEAM TEMPERATURE DURING 500 MW POWER UNIT STARTS.
    Danilov, S.N.
    Pokhoriler, V.L.
    Vlasov, A.P.
    Fiskind, E.E.
    Soviet power engineering, 1982, 11 (10): : 821 - 826
  • [38] CLEANING CONDENSATE CIRCUIT OF 500 MW UNIT AT NAZAROVO POWER-STATION WITH WATER
    MISHENIN, YE
    THERMAL ENGINEERING, 1973, 20 (01) : 82 - 85
  • [39] TEST RUN OF PIPE LINE INSTALLATIONS IN 500-MW POWER UNIT BLOCKS
    GORNER, A
    ENERGIETECHNIK, 1980, 30 (06): : 224 - 225
  • [40] INVESTIGATION OF EFFICIENCY OF THE BOILER UNIT OF AN 800 MW POWER GENERATING UNIT OF THE UGLEGORSKAYA STATE REGIONAL POWER PLANT WITH A WIDE RANGE OF LOADS.
    Larionov, V.F.
    Surovov, A.E.
    Avdeev, I.A.
    Chuprov, V.V.
    Soviet power engineering, 1982, 11 (02): : 114 - 117