共 50 条
- [31] Efficacy of Automation of the Calculation and Analysis of Technical and Economic Performance of a Boiler Unit. Teploenergetika, 1979, (08): : 35 - 37
- [32] THE DESIGN OF POWER HANDLING FACILITIES ON 500-MW UNITS IN THE GDR ENERGIETECHNIK, 1984, 34 (12): : 472 - 475
- [33] Nonlinear boiler model of 300MW power unit for system dynamic performance studies ISIE 2001: IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS PROCEEDINGS, VOLS I-III, 2001, : 1296 - 1300
- [34] A Multizone Model of an Economizer in a 600 MW Boiler Unit JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2012, 134 (04):
- [35] Optimization of Starting Conditions of a 500 MW Power Unit with a K-500-240-2 Turbine. Teploenergetika, 1985, (04): : 51 - 55
- [36] RESEARCH AND DESIGN OF 1000 MW ULTRA-SUPERCRITICAL UNIT BOILER FEED PUMP TURBINE PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 3, 2009, : 359 - 364
- [37] REGULATING RESUPERHEATED STEAM TEMPERATURE DURING 500 MW POWER UNIT STARTS. Soviet power engineering, 1982, 11 (10): : 821 - 826
- [39] TEST RUN OF PIPE LINE INSTALLATIONS IN 500-MW POWER UNIT BLOCKS ENERGIETECHNIK, 1980, 30 (06): : 224 - 225
- [40] INVESTIGATION OF EFFICIENCY OF THE BOILER UNIT OF AN 800 MW POWER GENERATING UNIT OF THE UGLEGORSKAYA STATE REGIONAL POWER PLANT WITH A WIDE RANGE OF LOADS. Soviet power engineering, 1982, 11 (02): : 114 - 117