FORECASTING COMPLETION TIMES FOR OPERATIONS WITH FUZZY DURATIONS.

被引:0
|
作者
Feygin, L.I.
机构
来源
| 1600年 / 23期
关键词
COMPLETION-TIME FORECASTING - OPERATIONS WITH FUZZY DURATIONS;
D O I
暂无
中图分类号
学科分类号
摘要
(Edited Abstract)
引用
收藏
相关论文
共 50 条
  • [21] A New evolving Fuzzy System with Mechanisms to Deal With Uncertainties in Times Series Forecasting
    Rocha Alves, Kaike Sa Teles
    Pekaslan, Direnc
    Wagner, Christian
    de Aguiar, Eduardo Pestana
    2022 IEEE LATIN AMERICAN CONFERENCE ON COMPUTATIONAL INTELLIGENCE (LA-CCI), 2022, : 1 - 6
  • [22] ANALYTIC METHOD OF STANDARDIZING THE DURATIONS OF CHECKING OPERATIONS
    GOLTMAN, AA
    MINKO, EV
    POZ, VA
    MEASUREMENT TECHNIQUES USSR, 1982, 25 (02): : 187 - 190
  • [23] Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms
    Lai, Peng-Jen
    Wu, Hsien-Chung
    APPLIED SOFT COMPUTING, 2011, 11 (08) : 4540 - 4550
  • [24] Automated project completion forecasting
    Tetarenko, Alexandra J.
    Parsons, Harriet
    Graves, Sarah
    Dempsey, Jessica
    arXiv, 2020,
  • [25] On Forecasting Project Activity Durations with Neural Networks
    Zachares, Peter
    Hovhannisyan, Vahan
    Ledezma, Carlos
    Gante, Joao
    Mosca, Alan
    ENGINEERING APPLICATIONS OF NEURAL NETWORKS, EAAAI/EANN 2022, 2022, 1600 : 103 - 114
  • [26] Business cycles - Durations, dynamics, and forecasting.
    Meier, CP
    WELTWIRTSCHAFTLICHES ARCHIV-REVIEW OF WORLD ECONOMICS, 2000, 136 (04): : 759 - 761
  • [27] On realisation of an optimal schedule with uncertain durations of operations
    Sotskova, NY
    Tanaev, VS
    DOKLADY AKADEMII NAUK BELARUSI, 1998, 42 (05): : 8 - 12
  • [28] Automated Project Completion Forecasting
    Tetarenko, Alex J.
    Parsons, Harriet
    Graves, Sarah F.
    Dempsey, Jessica
    OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS VIII, 2020, 11449
  • [29] GEOMETRIC CORRELATES OF TEMPORAL DURATIONS - SIGNS OF TIMES
    ZELKIND, I
    BACHHUBE.M
    PERCEPTUAL AND MOTOR SKILLS, 1970, 31 (03) : 971 - &
  • [30] MINIMIZING THE SUM OF COMPLETION TIMES WITH RESOURCE DEPENDANT TIMES
    Yedidsion, Liron
    Shabtay, Dvir
    Kaspi, Moshe
    INTERNATIONAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION, 2008, 1052 : 292 - 297