MINIMIZING THE SUM OF COMPLETION TIMES WITH RESOURCE DEPENDANT TIMES

被引:0
|
作者
Yedidsion, Liron [1 ]
Shabtay, Dvir [1 ]
Kaspi, Moshe [1 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
来源
INTERNATIONAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION | 2008年 / 1052卷
关键词
Scheduling; controllable processing times; complexity; resource allocation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We extend the classical minimization sum of completion times problem to the case where the processing times are controllable by allocating a nonrenewable resource. The quality of a solution is measured by two different criteria. The first criterion is the sum of completion times and the second is the total weighted resource consumption. We consider four different problem variations for treating the two criteria. We prove that this problem is NP-hard for three of the four variations even if all resource consumption weights are equal. However, somewhat surprisingly, the variation of minimizing the integrated objective function is solvable in polynomial time. Although the sum of completion times is arguably the most important scheduling criteria, the complexity of this problem, up to this paper, was an open question for three of the four variations. The results of this research have various implementations, including efficient battery usage on mobile devices such as mobile computer, phones and GPS devices in order to prolong their battery duration.
引用
收藏
页码:292 / 297
页数:6
相关论文
共 50 条