GA-based approach to single machine scheduling with general early-tardy penalty weights

被引:0
|
作者
Yu, Haibin
Xue, Jinsong
Wang, Haobo
Xu, Xinhe
机构
来源
| 2000年 / South China Univ Technol, China卷 / 17期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] GA-based discrete dynamic programming approach for scheduling in FMS environments
    Yang, JB
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2001, 31 (05): : 824 - 835
  • [32] Dispatching heuristics for the single machine early/tardy scheduling problem with job-independent penalties
    Valente, Jorge M. S.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 52 (04) : 434 - 447
  • [33] A GA-based heuristic approach for offshore structure construction spatial scheduling under uncertainty
    Dai, Lei
    Hu, Hao
    Chen, Feier
    SHIPS AND OFFSHORE STRUCTURES, 2015, 10 (06) : 660 - 668
  • [34] On Static Scheduling of Tasks in Real Time Multiprocessor Systems: An Improved GA-Based Approach
    Ababneh, Mohammad
    Hassan, Salama
    Bani-Ahmad, Sulieman
    INTERNATIONAL ARAB JOURNAL OF INFORMATION TECHNOLOGY, 2014, 11 (06) : 560 - 572
  • [35] Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem
    Wang, B
    Xi, YG
    Gu, HY
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (11) : 3059 - 3072
  • [36] A GA based scheduling system for dynamic single machine problem
    Madureira, A
    Ramos, C
    Silva, SD
    PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY, 2001, : 262 - 267
  • [37] An Optimization Approach for Scheduling and Lot Sizing Problems in Electromechanical Industry Using GA-Based Method
    Oleskow-Szlapka, Joanna
    Pawlowski, Grzegorz
    Fertsch, Marek
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 : 140 - 150
  • [38] Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication
    Chen, JH
    Fu, LC
    Lin, MH
    Huang, AC
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 619 - 636
  • [39] Material Supply Scheduling for a Mobile Robot with Supply Quantity Consideration-A GA-based Approach
    Nielsen, Izabela
    Ngoc Anh Dung Do
    Nielsen, Peter
    Khosiawan, Yohanes
    INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2015, PT I, 2016, 429 : 41 - 52
  • [40] A SINGLE-MACHINE TWO-AGENT SCHEDULING PROBLEM BY GA APPROACH
    Cheng, Shuenn-Ren
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2012, 29 (02)