GA-based discrete dynamic programming approach for scheduling in FMS environments

被引:49
|
作者
Yang, JB [1 ]
机构
[1] Univ Manchester, Inst Sci & Technol, Manchester Sch Management, Manchester M60 1QD, Lancs, England
关键词
dynamic programming; flexible manufacturing system (FMS); genetic algorithms (GAs); heuristics; scheduling;
D O I
10.1109/3477.956045
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a new genetic algorithm (GA)-based discrete dynamic programming (DDP) approach for generating static schedules in a flexible manufacturing system (FMS) environment. This GA-DDP approach adopts a sequence-dependent schedule generation strategy, where a GA is employed to generate feasible job sequences and a series of discrete dynamic programs are constructed to generate legal schedules for a given sequence of jobs. In formulating the GA, different performance criteria could be easily included. The developed DDP algorithm is capable of identifying locally optimized partial schedules and shares the computation efficiency of dynamic programming. The algorithm is designed in such a way that it does not suffer from the state explosion problem inherent in pure dynamic programming approaches in FMS scheduling. Numerical examples are reported to illustrate the approach.
引用
收藏
页码:824 / 835
页数:12
相关论文
共 50 条
  • [1] GA-Based Scheduling for Transporting and Manufacturing Mobile Robots in FMS
    Lam Nguyen
    Dang, Quang-Vinh
    Nielsen, Izabela
    DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, (DCAI 2016), 2016, 474 : 555 - 563
  • [2] A GA-Based Approach for FMS Machine Loading Planing
    杨红红
    HighTechnologyLetters, 2001, (03) : 64 - 69
  • [3] A Knowledge Based GA Approach for FMS Scheduling
    Wadhwa, Subhash
    Prakash, Anuj
    Deshmukh, S. G.
    IMECS 2009: INTERNATIONAL MULTI-CONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2009, : 1715 - +
  • [4] A hybrid GA-based scheduling algorithm for heterogeneous computing environments
    Yu, Han
    2007 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING, 2007, : 87 - +
  • [5] A GA-based approach for solving fuzzy project scheduling
    Liu, Yan
    Zhao, Sheng-Li
    Zhang, Xi-Ping
    Du, Guang-Qian
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3153 - +
  • [6] A dynamic programming approach to GA-based heuristic for multi-period CF problems
    Sharifi, Shahram
    Chauhan, Satyaveer S.
    Bhuiyan, Nadia
    JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (03) : 366 - 375
  • [7] A GA-based Fuzzy Logic Approach to Mobile Robot Navigation in Unknown Dynamic Environments with Moving Obstacles
    Tan, Suo
    Zhu, Anmin
    Yang, Simon X.
    2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 529 - 534
  • [8] GA-based integrated approach to FMS part type selection and machine-loading problem
    Yang, HH
    Wu, ZM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (16) : 4093 - 4110
  • [9] Discrete model for hybrid dynamical approach to FMS scheduling
    Somló, J
    Savkin, AV
    INTELLIGENT MANUFACTURING SYSTEMS 2003, 2003, : 81 - 88
  • [10] A filtered-beam-search based approach for FMS dynamic scheduling
    School of Mechanical Eng., Shanghai Jiaotong Univ., Shanghai 200240, China
    Shanghai Jiaotong Daxue Xuebao, 2007, 1 (94-99):