共 50 条
- [1] GA-Based Scheduling for Transporting and Manufacturing Mobile Robots in FMS DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, (DCAI 2016), 2016, 474 : 555 - 563
- [3] A Knowledge Based GA Approach for FMS Scheduling IMECS 2009: INTERNATIONAL MULTI-CONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2009, : 1715 - +
- [4] A hybrid GA-based scheduling algorithm for heterogeneous computing environments 2007 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING, 2007, : 87 - +
- [5] A GA-based approach for solving fuzzy project scheduling PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3153 - +
- [7] A GA-based Fuzzy Logic Approach to Mobile Robot Navigation in Unknown Dynamic Environments with Moving Obstacles 2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 529 - 534
- [9] Discrete model for hybrid dynamical approach to FMS scheduling INTELLIGENT MANUFACTURING SYSTEMS 2003, 2003, : 81 - 88
- [10] A filtered-beam-search based approach for FMS dynamic scheduling Shanghai Jiaotong Daxue Xuebao, 2007, 1 (94-99):