GA-based discrete dynamic programming approach for scheduling in FMS environments

被引:49
|
作者
Yang, JB [1 ]
机构
[1] Univ Manchester, Inst Sci & Technol, Manchester Sch Management, Manchester M60 1QD, Lancs, England
关键词
dynamic programming; flexible manufacturing system (FMS); genetic algorithms (GAs); heuristics; scheduling;
D O I
10.1109/3477.956045
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a new genetic algorithm (GA)-based discrete dynamic programming (DDP) approach for generating static schedules in a flexible manufacturing system (FMS) environment. This GA-DDP approach adopts a sequence-dependent schedule generation strategy, where a GA is employed to generate feasible job sequences and a series of discrete dynamic programs are constructed to generate legal schedules for a given sequence of jobs. In formulating the GA, different performance criteria could be easily included. The developed DDP algorithm is capable of identifying locally optimized partial schedules and shares the computation efficiency of dynamic programming. The algorithm is designed in such a way that it does not suffer from the state explosion problem inherent in pure dynamic programming approaches in FMS scheduling. Numerical examples are reported to illustrate the approach.
引用
收藏
页码:824 / 835
页数:12
相关论文
共 50 条
  • [21] A class decomposition approach for GA-based classifiers
    Guan, SU
    Zhu, FM
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2005, 18 (03) : 271 - 278
  • [22] GA-based flexible and effective task scheduling and resource allocation
    Bercsey, Tibor
    Rick, Tamas
    Groma, Istvan
    Granicz, Adam
    WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL I, PROCEEDINGS, 2006, : 119 - 124
  • [23] GA-based approach to single machine scheduling with general early-tardy penalty weights
    Yu, Haibin
    Xue, Jinsong
    Wang, Haobo
    Xu, Xinhe
    2000, South China Univ Technol, China (17):
  • [24] A GA-based NN approach for makespan estimation
    Li, Shujuan
    Li, Yan
    Liu, Yong
    Xu, Yuefei
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 185 (02) : 1003 - 1014
  • [25] GA-based on-line optimization of CAN message scheduling
    Duzanec, D.
    Stare, Z.
    Kovacic, Z.
    2007 MEDITERRANEAN CONFERENCE ON CONTROL & AUTOMATION, VOLS 1-4, 2007, : 1878 - +
  • [26] GA-based Minimization of Scheduling Problem in Photolithographic Track Systems
    McAlister, B.
    Siddique, N. H.
    Amavasai, B. P.
    2012 IEEE 11TH INTERNATIONAL CONFERENCE ON CYBERNETIC INTELLIGENT SYSTEMS (CIS), 2012,
  • [27] GA-based approach to discover meaningful biclusters
    Aguilar-Ruiz, Jesus S.
    Divina, Federico
    GECCO 2005: GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, VOLS 1 AND 2, 2005, : 473 - 474
  • [28] An Optimization Approach for Scheduling and Lot Sizing Problems in Electromechanical Industry Using GA-Based Method
    Oleskow-Szlapka, Joanna
    Pawlowski, Grzegorz
    Fertsch, Marek
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 : 140 - 150
  • [29] Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication
    Chen, JH
    Fu, LC
    Lin, MH
    Huang, AC
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 619 - 636
  • [30] Material Supply Scheduling for a Mobile Robot with Supply Quantity Consideration-A GA-based Approach
    Nielsen, Izabela
    Ngoc Anh Dung Do
    Nielsen, Peter
    Khosiawan, Yohanes
    INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2015, PT I, 2016, 429 : 41 - 52