共 50 条
- [41] THE INCORPORATION OF TASK ANALYSIS INTO AP1000 CONTROL ROOMS DESIGN PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1, 2011, : 845 - 850
- [43] Transient analysis for water level of AP1000 steam generator Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2013, 47 (SUPPL.): : 610 - 613
- [44] Qualitative accident analysis on loss of normal feedwater for AP1000 Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2012, 46 (SUPPL. 1): : 295 - 300
- [45] Impact Of Diffuser Width On The Performance Of AP1000 Reactor Coolant Pump ELECTRICAL POWER & ENERGY SYSTEMS, PTS 1 AND 2, 2012, 516-517 : 921 - 925
- [46] Study on Transient Performance in Loss of Coolant Accident for AP1000 SFP Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (01): : 147 - 151
- [47] THERMAL HYDRAULIC PERFORMANCE ANALYSIS FOR PASSIVE CONTAINMENT COOLING SYSTEM OF AP1000 IN THE EVENT OF LOCA PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 6, 2017,
- [48] A Brief Analysis of AP1000 and CPR1000 Excore Nuclear Instrument System 2018, Shanghai Jiaotong University (52): : 41 - 45
- [50] THE AP1000 LBLOCA ANALYSIS USING SCDAP/RELAP5 PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 3, 2014,