Fast method for heuristics in large-scale flow shop scheduling

被引:0
|
作者
Department of Automation, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
来源
Tsinghua Sci. Tech. | 2006年 / 1卷 / 12-18期
关键词
Manufacture;
D O I
10.1016/S1007-0214(06)70148-1
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Heuristics for permutation flow shop scheduling with batch setup times
    Sotskov, YN
    Tautenhahn, T
    Werner, F
    OR SPEKTRUM, 1996, 18 (02) : 67 - 80
  • [32] The Asymptotic Convergence of some flow-shop scheduling heuristics
    Portougal, V
    Scott, JL
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2001, 18 (02) : 243 - 256
  • [33] An Effective Solution Space Clipping-Based Algorithm for Large-Scale Permutation Flow Shop Scheduling Problem
    Li, Yang
    Li, Xinyu
    Gao, Liang
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (01): : 635 - 646
  • [34] Rolling horizon procedure for large-scale job-shop scheduling problems
    Wang, Bing
    Li, Qiaoyun
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, : 829 - 834
  • [35] An integrated search heuristic for large-scale flexible job shop scheduling problems
    Yuan, Yuan
    Xu, Hua
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (12) : 2864 - 2877
  • [36] Fast routing and wavelength assignment heuristics for large-scale WDM optical networks
    Siregar, JH
    Takagi, H
    Zhang, YB
    IEICE TRANSACTIONS ON COMMUNICATIONS, 2003, E86B (12) : 3530 - 3537
  • [37] Large-Scale and Rapid Flow Size Estimation for Improving Flow Scheduling
    Wang, Su
    Wang, Shuo
    Zhou, Dong
    Yang, Yiran
    Zhang, Wenjie
    Huang, Tao
    Huo, Ru
    Liu, Yunjie
    IEEE INFOCOM 2020 - IEEE CONFERENCE ON COMPUTER COMMUNICATIONS WORKSHOPS (INFOCOM WKSHPS), 2020, : 1141 - 1146
  • [38] JOB SHOP SCHEDULING HEURISTICS AND FREQUENCY OF SCHEDULING
    MUHLEMANN, AP
    LOCKETT, AG
    FARN, CK
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (02) : 227 - 241
  • [39] An Interactive High Speed Scheduling Method by Tabu Search for A Large-Scale Job Shop Problem with Group Constraints
    Tamura, Shingo
    Kawamura, Nobuyuki
    Ikkai, Yoshitomo
    Komoda, Norihisa
    ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [40] Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    Karthik Sourirajan
    Reha Uzsoy
    Journal of Scheduling, 2007, 10 : 41 - 65