Fast method for heuristics in large-scale flow shop scheduling

被引:0
|
作者
Department of Automation, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
机构
来源
Tsinghua Sci. Tech. | 2006年 / 1卷 / 12-18期
关键词
Manufacture;
D O I
10.1016/S1007-0214(06)70148-1
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems
    Fuqing Zhao
    Xuan He
    Yi Zhang
    Wenchang Lei
    Weimin Ma
    Chuck Zhang
    Houbin Song
    Applied Intelligence, 2020, 50 : 87 - 100
  • [22] MODIFIED BOTTLENECK-BASED PROCEDURE FOR LARGE-SCALE FLOW-SHOP SCHEDULING PROBLEMS WITH BOTTLENECK
    ZUO Yan GU Hanyu XI Yugeng Institute of Automation
    Chinese Journal of Mechanical Engineering, 2006, (03) : 356 - 361
  • [23] An improved version of the NEH algorithm and its application to large-scale flow-shop scheduling problems
    Jin, Feng
    Song, Shiji
    Wu, Cheng
    IIE TRANSACTIONS, 2007, 39 (02) : 229 - 234
  • [24] A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems
    Zhao, Fuqing
    He, Xuan
    Zhang, Yi
    Lei, Wenchang
    Ma, Weimin
    Zhang, Chuck
    Song, Houbin
    APPLIED INTELLIGENCE, 2020, 50 (01) : 87 - 100
  • [25] A Fast and Efficient Fluid Relaxation Algorithm for Large-Scale Re-entrant Flexible Job Shop Scheduling
    Ding, Linshan
    Guan, Zailin
    Zhang, Zhengmin
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 396 - 404
  • [26] Handling ties in heuristics for the permutation flow shop scheduling problem
    Vasiljevic, Dragan
    Danilovic, Milos
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 : 1 - 9
  • [27] Efficient heuristics for the parallel blocking flow shop scheduling problem
    Ribas, Imma
    Companys, Ramon
    Tort-Martorell, Xavier
    EXPERT SYSTEMS WITH APPLICATIONS, 2017, 74 : 41 - 54
  • [28] Constructive and improvement flow shop scheduling heuristics: an extensive evaluation
    Ponnambalam, SG
    Aravindan, P
    Chandrasekaran, S
    PRODUCTION PLANNING & CONTROL, 2001, 12 (04) : 335 - 344
  • [29] Heuristics based hybrid approach of flow shop scheduling problem
    Lokesh, K.
    Jayaprakash, J.
    Alene, Tibebu
    4TH INTERNATIONAL CONFERENCE ON DESIGN, ANALYSIS, MANUFACTURING AND SIMULATION (ICDAMS 2020), 2020, 992
  • [30] A performance comparison of alternative heuristics for the Flow Shop Scheduling problem
    Esquivel, S
    Leguizamón, G
    Zuppa, F
    Gallard, R
    APPLICATIONS OF EVOLUTIONARY COMPUTING, PROCEEDINGS, 2002, 2279 : 51 - 60