共 50 条
- [42] On quality control of project design budgetary estimate and network research PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1, 2004, : 709 - 712
- [43] The research on generic project risk element network transmission parallel computing model ADVANCES IN COMPUTATION AND INTELLIGENCE, PROCEEDINGS, 2007, 4683 : 539 - +
- [44] Research on Evolutionary Games Model for Project Stakeholders Based on Risk-Benefit CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 1119 - +
- [45] Engineering Project Risk Evaluation System Construction and Research Based on BP Model FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
- [46] Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved 2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2073 - 2077
- [47] Research on equilibrium model of risk allocation in construction project based on game theory PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 253 - 256
- [48] Research on the risk evaluation model of project duration based on PERT and Fuzzy Theory Xi'an Jianzhu Keji Daxue Xuebao, 2007, 4 (547-550):
- [49] Risk Evaluation Research and Model Building Based on ANP for BT Engineering Project FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1950 - +
- [50] Research on Multi-risk Element Transmission Model of Enterprise Project Chain 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 345 - 348