Research on the risk factor estimate method of the model project

被引:0
|
作者
Dong, Pei-Wu [1 ]
Zhao, Feng-Xue [2 ]
Bai, Fu-Gao [1 ]
机构
[1] School of Management and Economics, Beijing Institute of Technology, Beijing 100081, China
[2] Chinese Academy of Space Technology, Beijing 100083, China
关键词
Risk management;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:131 / 133
相关论文
共 50 条
  • [41] Research on Safety Risk Assessment Method for Large Scale Field Operation Project
    JIANG Wei-yang
    ZHAO Man-yun
    ZHANG Lian
    SONG Wei-dong
    International Journal of Plant Engineering and Management, 2016, 21 (02) : 65 - 74
  • [42] On quality control of project design budgetary estimate and network research
    Fu, ZL
    Li, XH
    Hua, DW
    PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1, 2004, : 709 - 712
  • [43] The research on generic project risk element network transmission parallel computing model
    Li, Cunbin
    Wang, Jianjun
    ADVANCES IN COMPUTATION AND INTELLIGENCE, PROCEEDINGS, 2007, 4683 : 539 - +
  • [44] Research on Evolutionary Games Model for Project Stakeholders Based on Risk-Benefit
    Wang, Yanwei
    Liu, Xingzhi
    Zang, Ningning
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 1119 - +
  • [45] Engineering Project Risk Evaluation System Construction and Research Based on BP Model
    Zhang Jianwei
    Ye Donglu
    Ye Guanchan
    Zhou Jingzhi
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
  • [46] Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved
    Yu, Zhenyu
    Yang, Kun
    Luo, Yi
    Deng, Qiongfei
    2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2073 - 2077
  • [47] Research on equilibrium model of risk allocation in construction project based on game theory
    Zhang, EW
    Li, QM
    Deng, XP
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 253 - 256
  • [48] Research on the risk evaluation model of project duration based on PERT and Fuzzy Theory
    School of Manag., Xi'an Univ. of Arch. and Tech., Xi'an 710055, China
    Xi'an Jianzhu Keji Daxue Xuebao, 2007, 4 (547-550):
  • [49] Risk Evaluation Research and Model Building Based on ANP for BT Engineering Project
    Zhang Jianwei
    Reng Guangfei
    Li Zhenqing
    Li Jun
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1950 - +
  • [50] Research on Multi-risk Element Transmission Model of Enterprise Project Chain
    Li, Cunbin
    Zhang, Liang
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 345 - 348