Research on the risk factor estimate method of the model project

被引:0
|
作者
Dong, Pei-Wu [1 ]
Zhao, Feng-Xue [2 ]
Bai, Fu-Gao [1 ]
机构
[1] School of Management and Economics, Beijing Institute of Technology, Beijing 100081, China
[2] Chinese Academy of Space Technology, Beijing 100083, China
关键词
Risk management;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:131 / 133
相关论文
共 50 条
  • [31] Study of the PROMETHEE method with the utility function in project estimate
    Zhang Huaiqiang
    Liang Xin
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2268 - 2271
  • [32] RISK IDENTIFICATION METHOD FOR ENGINEERING DESIGN PROJECT BASED ON RISK CHAIN MECHANISM MODEL
    Nomaguchi, Yutaka
    Dong, Chunzhi
    Nakashima, Hirotaka
    Fujita, Kikuo
    INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2015, VOL 4, 2016,
  • [33] Research on the Method of Using the PRISM Model to Improve the Estimated Time of the Project
    Zhang, Jing
    Li, Chengyue
    Liu, Lu
    Hu, Yifan
    Gao, Yihao
    Zheng, Kai
    Huang, Xin
    2018 NINTH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY IN MEDICINE AND EDUCATION (ITME 2018), 2018, : 968 - 971
  • [34] Research on ROI of BT Project Based on Singel-factor APT Model
    Gao, Hua
    Wang, Li-juan
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 841 - 843
  • [35] Assessment Model and Method Research of Information Security Risk
    Lu Zhen
    Xiong Zhen
    Tu Keqin
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5, 2014, 496-500 : 2170 - +
  • [36] Risk Factor Prediction Model of Oil and Gas Construction Project Based on Combination Mathematical Model
    Qiu, Humiao
    Yu, Xiaozhong
    Dong, Jianrong
    EKOLOJI, 2019, 28 (107): : 4033 - 4043
  • [37] Research on the Evaluation of Intelligence Capital Led to the Estimate of Investment Project
    Ma Jie
    Wang Lingling
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2008, : 1249 - 1253
  • [38] DEVELOPING A PROJECT PORTFOLIO SELECTION MODEL FOR CONTRACTOR FIRMS CONSIDERING THE RISK FACTOR
    Abbasianjahromi, Hamidreza
    Rajaie, Hossein
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) : 879 - 889
  • [39] A psychosocial risk factor model for female eating disorders: A European multicentre project
    Krug I.
    Fuller-Tyszkiewicz M.
    Mitchell S.
    Fernandez-Aranda F.
    Karwautz A.
    Wagner G.
    Anderluh M.
    Bellodi L.
    Nacmias B.
    Rica V.
    Sorbi S.
    Tchanturia K.
    Collier D.
    Treasure J.
    Micali N.
    Journal of Eating Disorders, 2 (Suppl 1)
  • [40] Research on Risk Assessment of Photovoltaic Building Project by Triangular Fuzzy Number Method
    Liu, Yi
    Dai, Xintong
    Meng, Qingzhe
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION REFORM AND MODERN MANAGEMENT (ERMM 2015), 2015, 15 : 354 - 358