Resource-constrained scheduling in repetitive projects

被引:0
|
作者
Zhang, Li-hui [1 ]
Zou, Xin [1 ]
Chen, Xin-lu [1 ]
机构
[1] North China Electric Power University, China
关键词
D O I
10.4156/AISS.vol4.issue14.35
中图分类号
学科分类号
摘要
引用
收藏
页码:287 / 294
相关论文
共 50 条
  • [41] Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects
    Maheswari, J. Uma
    Charlesraj, V. Paul C.
    Goyal, Anshul
    Mujumdar, Purva
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 308 - 315
  • [42] A PETRI-NET BASED APPROACH FOR SCHEDULING AND RESCHEDULING RESOURCE-CONSTRAINED MULTIPLE PROJECTS
    Kao, Hsing-Pei
    Hsieh, Ben
    Yeh, Yingchieh
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 468 - 477
  • [43] Min-Conflicts Heuristic for Multi-Mode Resource-Constrained Projects Scheduling
    Ahmeti, Arben
    Musliu, Nysret
    GECCO'18: PROCEEDINGS OF THE 2018 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2018, : 237 - 244
  • [44] Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects
    Kuo-Ching Ying
    Shih-Wei Lin
    Zne-Jung Lee
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 358 - 366
  • [45] Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects
    Ying, Kuo-Ching
    Lin, Shih-Wei
    Lee, Zne-Jung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (3-4): : 358 - 366
  • [46] Work package-based information modeling for resource-constrained scheduling of construction projects
    Wang, Heng-Wei
    Lin, Jia-Rui
    Zhang, Jian-Ping
    AUTOMATION IN CONSTRUCTION, 2020, 109
  • [47] A System for Generation and Visualization of Resource-Constrained Projects
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    ARTIFICIAL INTELLIGENCE RESEARCH AND DEVELOPMENT: RECENT ADVANCES AND APPLICATIONS, 2014, 269 : 237 - 246
  • [48] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [49] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [50] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381