共 50 条
- [34] Time-cost trade-off analysis of a priority based assignment problem OPSEARCH, 2021, 58 : 448 - 482
- [37] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
- [38] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
- [39] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
- [40] LP/IP hybrid method for construction time-cost trade-off analysis Constr Manage Econ, 3 (265-276):