Poira bridge: Construction of India's first horizontal swing bridge

被引:0
|
作者
S.N. Bhobe and Associates Pvt. Ltd. [1 ]
不详 [2 ]
机构
来源
Indian Concrete Journal | 2007年 / 81卷 / 08期
关键词
Canals; -; Construction; Rotation; Ships;
D O I
暂无
中图分类号
学科分类号
摘要
The paper covers the details of the Poira horizontal swing bridge, the first of its kind to be completed in India. There are a number of bridges with vertical opening of the superstructure for facilitating movement of ships/barges in the river/canal/sea but in this case horizontal opening of a super structure for navigation purpose has been provided. The paper gives full details of the salient features, design, construction testing, operation and maintenance of the bridges.
引用
收藏
页码:33 / 42
相关论文
共 50 条
  • [31] BRIDGE CONSTRUCTION SURVEYING
    BURGAN, RW
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (03): : 665 - 665
  • [32] BRIDGE CONSTRUCTION SURVEYING
    BURGAN, RW
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO2): : 105 - 111
  • [33] Tendencies in bridge construction
    Natterer, J
    5TH WORLD CONFERENCE ON TIMBER ENGINEERING, VOL 2, PROCEEDINGS, 1998, : 100 - 107
  • [34] Gordie Howe International Bridge Construction Anxieties—The Bridge
    Pickle, R.
    van Rooyen, A.
    Lecture Notes in Civil Engineering, 2023, 251 : 177 - 190
  • [35] Digital bridge construction
    Drossou, O
    Fücks, R
    INTERNATIONALE POLITIK, 2006, 61 (01): : 107 - 111
  • [36] Construction of the Ikuchi Bridge
    Asahi, Kazuho
    Miyashita, Chikara
    Fujiwara, Tohru
    1600, (31):
  • [37] Bridge Construction Equipment
    Sanchez, Marcos
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2014, 167 (04) : 340 - 340
  • [39] Changing (bridge) construction
    Fischer, Oliver
    Beton- und Stahlbetonbau, 2020, 115 (10):
  • [40] Accelerated Bridge Construction
    Azizinamini, Atorod
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (12)