Poira bridge: Construction of India's first horizontal swing bridge

被引:0
|
作者
S.N. Bhobe and Associates Pvt. Ltd. [1 ]
不详 [2 ]
机构
来源
Indian Concrete Journal | 2007年 / 81卷 / 08期
关键词
Canals; -; Construction; Rotation; Ships;
D O I
暂无
中图分类号
学科分类号
摘要
The paper covers the details of the Poira horizontal swing bridge, the first of its kind to be completed in India. There are a number of bridges with vertical opening of the superstructure for facilitating movement of ships/barges in the river/canal/sea but in this case horizontal opening of a super structure for navigation purpose has been provided. The paper gives full details of the salient features, design, construction testing, operation and maintenance of the bridges.
引用
收藏
页码:33 / 42
相关论文
共 50 条
  • [21] Asymptotics of a horizontal liquid bridge
    Haynes, M.
    O'Brien, S. B. G.
    Benilov, E. S.
    PHYSICS OF FLUIDS, 2016, 28 (04)
  • [22] INDIA - BROKEN BRIDGE
    不详
    ECONOMIST, 1965, 215 (07): : 749 - 750
  • [23] Bridge and building construction
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1931, 75 : 20 - 22
  • [24] Bridge construction in a Cast
    不详
    BAUINGENIEUR, 2014, 89 : A21 - A21
  • [25] BRIDGE CONSTRUCTION IN IRAN
    KLEISS, W
    ARCHITECTURA-ZEITSCHRIFT FUR GESCHICHTE DER BAUKUNST, 1983, 13 (02): : 105 - 112
  • [26] (Bridge) Construction in Transition
    Fischer, Oliver
    BETON- UND STAHLBETONBAU, 2020, 115 (10) : 745 - 745
  • [27] Bridge construction in Solothurn
    Brux, Gunther
    BETON- UND STAHLBETONBAU, 2009, 104 (08) : 552 - 554
  • [28] BRIDGE CONSTRUCTION SURVEYING
    COURTOIS, PD
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO4): : 655 - 657
  • [29] ORWELL BRIDGE CONSTRUCTION
    VANLOENEN, J
    TELFORD, S
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1983, 74 (NOV): : 779 - 804
  • [30] BRIDGE CONSTRUCTION DETAILS
    LALLY, A
    MILEK, WA
    ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION INC, 1969, 6 (01): : 3 - &