Simultaneous Due date assignment and lot sizing with uncertain flow times

被引:0
|
作者
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran [1 ]
机构
来源
Int. J. Eng. Trans. A Basics | 2007年 / 3卷 / 263-280期
关键词
52;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Measuring the performance of lot-sizing techniques in uncertain environments
    Jeunet, J
    Jonard, N
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 197 - 208
  • [42] DUE DATE ASSIGNMENT FOR PRODUCTION SYSTEMS
    SEIDMANN, A
    SMITH, ML
    MANAGEMENT SCIENCE, 1981, 27 (05) : 571 - 581
  • [43] DYNAMIC LOT-SIZING WHEN DEMAND TIMING IS UNCERTAIN
    BURSTEIN, MC
    NEVISON, CH
    CARLSON, RC
    OPERATIONS RESEARCH, 1984, 32 (02) : 362 - 379
  • [44] A robust model for the lot-sizing problem with uncertain demands
    Agostinho Agra
    Optimization Letters, 2023, 17 : 1279 - 1293
  • [45] Scheduling with common due date assignment
    Gordon, V
    Proth, JM
    Finke, G
    Chu, CB
    ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 1, PROCEEDINGS, 2001, : 553 - 557
  • [46] Scheduling Problems with Due Date Assignment
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Chiang, John Y.
    Chen, Jason C. H.
    Mao, Xuerong
    Wu, Chin-Chia
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [47] Due date assignment in repetitive projects
    Azaron, Amir
    Fynes, Brian
    Modarres, Mohammad
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 79 - 85
  • [48] Wealth-based production planning with uncertain lot sizing
    Wang, X.J. (kxjwang@hku.hk), 1600, International Association of Engineers (44):
  • [49] SIMULTANEOUS LOT SIZING AND SEQUENCING FOR MULTISTAGE PRODUCTION SYSTEMS
    AFENTAKIS, P
    IIE TRANSACTIONS, 1985, 17 (04) : 327 - 331