Simultaneous Due date assignment and lot sizing with uncertain flow times

被引:0
|
作者
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran [1 ]
机构
来源
Int. J. Eng. Trans. A Basics | 2007年 / 3卷 / 263-280期
关键词
52;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Minmax due-date assignment with a time window for acceptable lead-times
    Enrique Gerstl
    Gur Mosheiov
    Annals of Operations Research, 2013, 211 : 167 - 177
  • [32] A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility
    Kim, Yeong-Dae
    Bang, June-Young
    An, Kwee-Yeon
    Lim, Seung-Kil
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2008, 21 (02) : 209 - 216
  • [33] Common Due-Date Assignment and Scheduling on Single Machine with Exponential Processing Times
    D. K. Manna
    OPSEARCH, 2000, 37 (3) : 221 - 236
  • [34] Lot-sizing with start-up times
    Vanderbeck, F
    MANAGEMENT SCIENCE, 1998, 44 (10) : 1409 - 1425
  • [35] Integration of Lot Sizing and Flow Shop Scheduling with Lot Streaming
    Mortezaei, Navid
    Zulkifli, Norzima
    JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [36] Lot-sizing scheduling with batch setup times
    Bo Chen
    Yinyu Ye
    Jiawei Zhang
    Journal of Scheduling, 2006, 9 : 299 - 310
  • [37] Stochastic lot sizing problem with controllable processing times
    Koca, Esra
    Yaman, Hande
    Akturk, M. Selim
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 53 : 1 - 10
  • [38] Lot-sizing scheduling with batch setup times
    Chen, B
    Ye, YY
    Zhang, JW
    JOURNAL OF SCHEDULING, 2006, 9 (03) : 299 - 310
  • [39] Comparison of different approaches to multistage lot sizing with uncertain demand
    Bindewald, Viktor
    Dunke, Fabian
    Nickel, Stefan
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (06) : 3771 - 3800
  • [40] A robust model for the lot-sizing problem with uncertain demands
    Agra, Agostinho
    OPTIMIZATION LETTERS, 2023, 17 (06) : 1279 - 1293