共 50 条
- [32] Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times Journal of Scheduling, 2016, 19 : 165 - 176
- [33] Schedulability and Scheduling Analysis of Dual-Arm Cluster Tools with Wafer Revisiting and Residency Time Constraints Based on a Novel Schedule IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (03): : 472 - 484
- [36] Scheduling algorithm of multi-manipulator manufacturing cells with residency constraints Zhou, B.-H. (bhzhou@tongji.edu.cn), 1600, South China University of Technology (41): : 122 - 128
- [38] Scheduling Single-Blade Cluster Tools with Time Window Constraints 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1069 - 1072