Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations

被引:0
|
作者
机构
[1] Sebt, M.H.
[2] Zarandi, M.H. Fazel
[3] Alipouri, Y.
来源
Sebt, M. H. (sebt@aut.ac.ir) | 1600年 / Iran University of Science and Technology卷 / 11期
关键词
36;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Using Particle Swarm Optimization to Solve Resource-constrained Scheduling Problems
    Lo, Shih-Tang
    Chen, Ruey-Maw
    Shiau, Der-Fang
    Wu, Chung-Lun
    2008 IEEE CONFERENCE ON SOFT COMPUTING IN INDUSTRIAL APPLICATIONS SMCIA/08, 2009, : 38 - +
  • [42] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [43] A late-mover genetic algorithm for resource-constrained project-scheduling problems
    Liu, Yongping
    Huang, Lizhen
    Liu, Xiufeng
    Ji, Guomin
    Cheng, Xu
    Onstein, Erling
    INFORMATION SCIENCES, 2023, 642
  • [44] A bi-objective Model for Robust Resource-constrained Project Scheduling Problem with Random Activity Durations
    Zhang, Jingwen
    Qiao, Chuanzhuo
    2015 IEEE 12th International Conference on Networking, Sensing and Control (ICNSC), 2015, : 28 - 32
  • [45] Hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems
    School of Economics and Management, Southeast University, Nanjing 210096, China
    Dongnan Daxue Xuebao, 2008, 4 (736-740):
  • [46] Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
    Brucker, P
    Kramer, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 214 - 226
  • [47] Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
    Universitaet Osnabrueck, Osnabrueck, Germany
    Eur J Oper Res, 2 (214-226):
  • [48] Genetic algorithm-assisted fuzzy clustering framework to solve resource-constrained project problems
    Ji, Yangyang
    JOURNAL OF INTELLIGENT SYSTEMS, 2024, 33 (01)
  • [49] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [50] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362