Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations

被引:0
|
作者
机构
[1] Sebt, M.H.
[2] Zarandi, M.H. Fazel
[3] Alipouri, Y.
来源
Sebt, M. H. (sebt@aut.ac.ir) | 1600年 / Iran University of Science and Technology卷 / 11期
关键词
36;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Stochastic rollout and justification to solve the resource-constrained project scheduling problem
    Xu, Ningxiong
    Nozick, Linda
    Bernstein, Orr
    Jones, Dean
    PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1799 - 1806
  • [32] PRAC: A Software System to Solve the Resource-constrained Project Scheduling Problem
    Zhang, Mao-sheng
    Zhao, Ying
    Cao, Bo
    2016 INTERNATIONAL CONFERENCE ON BUSINESS AND MANAGEMENT (ICBM 2016), 2016, : 37 - 42
  • [33] Solving resource-constrained project scheduling problems under different activity assumptions
    Ben Issa, Samer
    Patterson, Raymond A.
    Tu, Yiliu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 180
  • [34] Particle swarm optimization for resource-constrained project scheduling problems with activity splitting
    Deng, Lin-Yi
    Lin, Yan
    Kongzhi yu Juece/Control and Decision, 2008, 23 (06): : 681 - 684
  • [35] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626
  • [36] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474
  • [37] On the performance of bee algorithms for resource-constrained project scheduling problem
    Ziarati, Koorush
    Akbari, Reza
    Zeighami, Vahid
    APPLIED SOFT COMPUTING, 2011, 11 (04) : 3720 - 3733
  • [38] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [39] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [40] A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms
    Olteanu, Alexandru-Liviu
    AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS, 2009, : 182 - +